Page 3

REV~SED

REPORT

DESIGN CRITERIA FOR SITE PROTECTION & PARK HABITAT RESTORA TION FOR A REVISED ALIGNMENT OF ALGONQUIN GAS TRANSMISSION COMPANY'S PROPOSED NATURAL GAS PIPELINE THROUGH THE LOANTAKA BROOK RESERVATION OF THE MORRIS COUNTY PARKS COMMISSION MORRIS COUNTY, NEW JERSEY 8 September 1986 with attached drawings 3A-C, 4A-C, and SA-C (revised) Prepared for ERT, A Resource Engineering Company Concord,Massachussetts ERT Reference: EMPC - 2703 I ERT Project: 0927

1986 Design Criteria Loantaka Brook  

The purpose of this report is to recommend measures that minimize habitat disturbance during construction of the pipeline as well as maximiz...

1986 Design Criteria Loantaka Brook  

The purpose of this report is to recommend measures that minimize habitat disturbance during construction of the pipeline as well as maximiz...