Page 23

PREl~MINARY

REPORT

DESIGN CRITERIA FOR SITE PROTECTION & PARK HABITAT RESTORATION FOR A REVISED ALIGNMENT OF ALGONQUIN GAS TRANSMISSION COMPANY'S PROPOSED NATURAL GAS PIPELINE THROUGH THE lOANT AKA BROOK RESERVA nON OF THE MORRIS COUNTY PARKS COMMISSION MORRIS COUNTY. NEW JERSEY I 5 August t 986 with attached drawings 3A-C, .!fA-C, and 5A-C Prepared for ERT, A Resource Engineering Comp..:my COl1cord, Massachussetts ERT Reference: EMPC - 2703 I ERT Project: 0927

1986 Design Criteria Loantaka Brook  

The purpose of this report is to recommend measures that minimize habitat disturbance during construction of the pipeline as well as maximiz...

1986 Design Criteria Loantaka Brook  

The purpose of this report is to recommend measures that minimize habitat disturbance during construction of the pipeline as well as maximiz...