RGN Vol 5 Iss 2

Page 112

112

LITHIUM | Critical Elements

At the time, president Dr Steffen Haber

with sustaining capital valued at C$126.8

said the feasibility was a ‘major milestone’

million over the life of mine.

for Critical Elements and when RGN caught up with him, he reiterated the company’s

Finally, the project’s NPV was calculated at

satisfaction with the results.

C$726 million (after-tax) with a superior IRR of 34.9% on price assumptions of

“In combination with the piloting results

US$1,500 per tonne technical grade lithium

preceding the feasibility, the superior

concentrate, US$750 per tonne chemical

quality of the ore has been confirmed and

grade lithium concentrate and US$130 per kg

demonstrated by the results,” he declares.

tantalum pentoxide.

The detailed study also included an economic Overall the figures outlined in the feasibility analysis which estimated an initial capital cost are highly encouraging for Critical Elements of C$341 million including all infrastructures,


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.