Page 22

22 | KST Re-introduction Guidelines

Environmental Mitigation Activities

Re-introduction Experiments

Kihansi Dam and Spray Zone Mitigation

Kihansi Dam and the environmental bypass flow in the Kihansi River immediately below the hydroelectric dam. Spray irrigation and jet spray systems that have been installed in the Upper Spray Wetland to maintain the spray wetland vegetation. (Credit: William Newmark).

Kihansi Spray Toad Re-introduction Guidelines  

Kihansi Spray Toad Re-introduction Guidelines

Kihansi Spray Toad Re-introduction Guidelines  

Kihansi Spray Toad Re-introduction Guidelines

Advertisement