Issuu on Google+

Roller Shutter door

Roller shutter door

Roller Shutter door

Roller Shutter door

DB-REC-16B

SUSPENDED CEILING

BULKHEAD TO DETAIL

BULKHEAD TO DETAIL

SUSPENDED CEILING BULKHEAD TO LATER DETAIL

DB-REC-16A

12mm Surrino on 32mm hardboard prefabricated worktop as per manufacturer's specification. Colour TBC

12mm Surrino on 32mm hardboard prefabricated worktop as per manufacturer's specification. Colour TBC

12mm Surrino on 32mm hardboard prefabricated worktop as per manufacturer's specification. Colour TBC

12mm SupaLam Super White MDF board fixed both sides to 75x38mm timber frame. Colour TBC

Natural Aluminium laminate finish to form kickplate

Natural Aluminium laminate finish to form kickplate

SECTION R2

SECTION R3

Concrete column with plaster finish. Colour TBC

Concrete column with plaster finish. Colour TBC

12mm Surrino on 32mm hardboard prefabricated worktop as per manufacturer's specification. Colour TBC

LINE OF BULKHEAD ABOVE Built in pigeon hole storage units under writing shelf. Laminated particle board. Colour TBC

Worktop over

FOR CONSTRUCTION

Writing shelf over

gromet to form cable port. Position TBC.

Writing shelf over

12mm SupaLam Super White MDF board fixed both sides to 75x38mm timber frame. Colour TBC

SECTION R2

Concrete column with plaster finish. Colour TBC

SECTION R1

Concrete column with plaster finish. Colour TBC

SECTION R1

SECTION R1

Natural Aluminium laminate finish to form kickplate

SECTION R2

12mm SupaLam Super White MDF board fixed both sides to 75x38mm timber frame. Colour TBC

leg with fixing plate top & bottom fixed to underside of worktop and screw fixed to floor.

leg with fixing plate top & bottom fixed to underside of worktop and screw fixed to floor. SECTION R3

SECTION R3

PLAN SECTION 2 C3

110309

ISSUED FOR CONSTRUCTION

C2

110304

C1

110111

UPDATED TO REFLECT CLIENT CHANGES ISSUED FOR CONSTRUCTION

Rev

Date

Revision Notes

DB-REC-16A

DB-REC-16A

FEATURE WALL. FINISH TBC

PLAN SECTION 2

RECORDS AND RECEPTION MAIN RECEPTION DESK JOINERY DETAILS

FOR MAIN RECEPTION DESK SPECIFICATION REFER TO DOCUMENT: A-510-01-L60 CLAUSE: 320A

PLAN SECTION 1

2010/07/14

DS

1:20

GM

FRONT ELEVATION

A 402 - 02

C3


April 4th Online Portfolio Update