Page 1

SELECTED WORKS

01


all pictures made by Aleksandra Norman, unless stated otherwise. 02


TABLE OF CONTENTS INTERIOR DESIGN 1.

SKY WHITE

2.

ELECTRIC BLUE

3.

BOLD BEIGE

4.

SEIGE GREEN

5.

NATURAL MONOCHROME

04 10 16 22 28

ARCHITECTURE 6.

FAMILY STORIES

7.

BOLERO

8.

RYDYGIERA

32 36 40

03


SKY WHITE Sierpc, Poland / 2018

project of an all-white apartment, where the usual sense of gravity is somewhat upside-down - the floor, which normally makes the base, here takes a sense of lightness, delicacy and is almost transparent in reception - features typically associated with ceilings. the ceiling here, on the other hand, no longer blends in, as it is painted blue. one can feel the sensation of being under a cloudless sky. all this combined makes the place feel bright, soft, almost ascetic, yet visually pleasing, calming and quiet.

04

sky white


sky white

05


06

sky white


omnipresent whiteness makes for a perfect background for furniture and art pieces sky white

07


08

sky white


coherence is the key in this apartment monochromatic accents, repeated textures and patterns along with the overal limit in accessories sky white

09


ELECTRIC BLUE Paris, France / 2016

complete renovation of an apartment, where everything was broken, dirty and neglected. previously bathroomless, shady place received a complete makeover, from the bottom to the top - starting with changing the electricity and plumbing, through recuperating the original parquet, to the finishing touches with brand new furniture, accessories and pictures. bold electric blue color, matched with copper pieces and glossed with a hint of marble make for an elegant, yet vibrant interior. all worthy of the lively area of Le Marais.

10

electric blue


photo by @photolucas

electric blue

11


photo by @photolucas

12

electric blue


two blue walls - in the living room, with the fireplace and tv frame blended in it, and in the bedroom, with a blue shelf, which serves as a bedside table electric blue

photo by @photolucas

13


photo by @photolucas

14

electric blue


white marble in the bathroom gives it a bit of glamour, while keeping it bright and shiny

photo by @photolucas

electric blue

15


BOLD BEIGE Puteaux, France / 2017

refreshing makeover of an apartment owned by a book lover. a place where the whole life happens all together - the kitchen with a vast island, ready to accomodate family and friends when needed and serving as a working area during the day, connected with the heart of the apartment - a large, tailor made bookcase, where all the treasure stands displayed for everyone to admire. delicate, natural colors that help focus without distractions, tinted with bold anthracite elements to emphasize the masculine character of the interior.

16

bold beige


bold beige

17


18

bold beige


former aged and boring kitchen was replaced by a brand new, more audacious one

bold beige

19


the kitchen island stands between two areas, where there was a wall seperating them. now the place feels more spacious and organised

20

bold beige


the bookcase is, at the same time, a background to the life happening in the room and a picture-like structure one can use and admire

bold beige

21


SAGE GREEN Paris, France / 2017

makeover of a small duplex apartment on the topmost floor of a Parisian building. previously bland and unattractive, with the hints of sage green and powder pink, it becomes playful, yet subtle. a mix of contemporary style with elegant accents that reflects the owners’ personalities and taste.

22

sage green


sage green

23


24

sage green


even a small space like this can be divided into seperate areas - kitchen, dinin and living room

sage green

25


26

sage green


black & white bathroom stands out a bit from the other rooms, but is still kept in the style of the apartment

sage green

27


NATURAL MONOCHROME Gostyn, Poland / 2017

project for an apartment of a young first-time-buyer. filled with lots of natural light, the space is kept in neutral, delicate tones, with a little hint of black, to give it more character. a variation of scandinavian style. plywood, wood, quartz, ceramic tiles. white, beige, gray, black. green plants to break the raw feeling. a great place to start creating new memories.

28

natural monochrome


natural monochrome

29


plywood cabinets might seem a bit raw but they enhance the natural character of the apartment

30

natural monochrome


natural monochrome

31


FAMILY STORIES Gostyn, Poland / 2015

a house designed for a modern, design-loving family. flat roof and sharp edges make it stand out from the neighbouring, more traditional buildings. three different levels of the house, wraped in stone, are ready to shelter the growing family and their belongings. the vast, double garage signifies the owners’ passion for vehicles, the spacious kitchen and dining room - liking of big, family parties. everything they love in one place. works still in progress (garden, roofing, fence)

32

family stories


family stories

33


ground floor

first floor

34

family stories


family stories

35


image by @monokolor

BOLERO Warsaw, Poland / 2015

a complex of office buildings and warehouse in Warsaw. I’ve been a part of the team working on this project, while employed at PRC Architekci. we went through different phases - from concept, through building project, up to execution plans, while at the same time preparing documentation for zoning and building permit. we collaborated with civil engineers, sanitary engineers, firefighters and multiple suppliers. a surprisingly challenging project, part of it is still ongoing.

36

bolero


bolero

37


D

E

810

810

810

2429,8

50

52,5

H

485

J

3395 810

50

810

760

50

810

760

50

50

827

EF-3 / 2

EF-3 / 1

EB-3

EF-3 / 1

EB-3

EF-3 / 1

EB-3

EB-3

EB-3

EB-2 LICOWAĆ

3

821-01

Wg

1

8

823-02

PP-1

ET-1/Sz-k/T2

G

1 301-01

1

405 ET-1/SM-18/T4

4

F

203-01

2429,8

4

LICOWAĆ

WYRÓWNANIE TYNKIEM USKOKU POMIĘDZY ŚCIANĄ MUROWANA I ŻELBETOWĄ

Wg

50

C 810

75

B 105

ET-1/SM-18/T3

ET-1/SM-18/T4

2

823-01

Wg

2

823-02

ET-1/SM-18/T3

Wg

823-01

12.13 539,39 m² Pow. Biurowa 1 PP-1 WS-m4 SF-m1

ET-1/SM-18/T3

Wg

1

Pd Ck

11

831-01

15

Wg

831-01

50

12.06 5,77 m² Rozdzielnia Elektr. PD-1/e1

LICOWAĆ

SM-12 Ck C-e1 T1 EI 120 Sc WS-m3

ET-1/SM-18/T3

SM-12 EI 120

Wg

SM-12 EI 120

T1 10x17.25 28

ET-1/SM-18/T4

823-02 12.03

10x17.25 28

16,52 m²

10x17.25 28

EF-3 / 7

405

EF-3 / 8

ET-1/SM-18/T3

Korytarz kl.1

460

UH-5/GP-2

GP-2

ET-1/SM-18/T3

760

PD-1 e1

67 8

785

50

835

2

DŹWIG A

411-02

1

12.07

300-01

Toal.Dam. przedsionek

2

12,14 m²

2

201-02

6

EB-3

56

137,5

823-02

10,8 m²

760 865

EF-3 / 3

Wg

4

12.02

1

DŹWIG B

12.08

94

217,5

ET-1/Sz-k/T2

810

ET-1/SM-18/T3

Klatka schod.1

EB-3

ET-1/SM-18/T4

Toaleta Damska

311-01

10,06 m²

1

201-02 276

202-01

1

3,32 m²

+20.700 +20.630 +13.800 +13.730 +6,900 +6,830

1

12.11

94

200-01

12.12

Toal.Męs. niepełn.

4960

1,79 m²

DŹWIG C

72,6 m²

1620

Pom. porządkowe 12.01

Hol Windowy

EF-2 / 2

1520

12.09

300-01

810

Wg

1

T1

EB-2

105

1520

EF-3 / 1

SF-m1

Sf

8 67

823-01

Pd

SM-12 EI 120 T1

358

52,5

2

411-01

5

114

810

LICOWAĆ

Wg

8

WYRÓWNANIE TYNKIEM USKOKU POMIĘDZY ŚCIANĄ MUROWANA I ŻELBETOWĄ

1620

760

823-02

760

3

421-01

7

823-01

4960

Wg

2

GP-6

EF-1 / 3

WS-tk2

6

Wg

Toaleta Męska 12,81 m²

56

1720

15

831-01

UH-2/GP-6

1615

5

+20.700 +20.550 +13.800 +13.650 +6,900 +6,750

Wg

EF-3 / 1

ET-1/SM-18/T3

PP-1 WS-tk2

1720

Sf

810

810

Sc

UWAGI OGÓLNE: 1. Obowiązkiem każdego wykonawcy jest rozpatrywanie niniejszego rysunku z innymi rysunkami branżowymi odnoszącymi się do konkretnego obszaru. W razie stwierdzenia jakichkolwiek rozbieżności zgłosić je nadzorowi autorskiemu przed przystąpieniem do pracy. Dotyczy to w szczególności występowania kolizji w usytuowaniu poszczególnych i wszystkich przewodow i urzadzeń instalacyjnych oraz zachowania wszystkich wymaganych odleglości i prześwitów. Wszystkie widoczne lub ukryte elementy winny być określone i zaaprobowane przez inwestora przed montażem. 2. Każda z robót winna spełniać wymagania wszystkich urzedów stanowiących normy i przepisy. W przypadku wątpliwosci obowiązują przepisy najostrzejsze. 3. Nie wolno brać wymiarów ze skali. Obowiazują wymiary podane. W przypadku rozbieżności pomiędzy stanem na budowie a rysunkami lub pomiędzy poszczególnymi rysunkami należy skonsultować się z inspektorem nadzoru. 4. Niedopuszczalna jest swobodna interpretacja wynikająca z zauważonych nieścisłości. 5. Rysunek należy rozpatrywać łącznie ze specyfikacją architektoniczną, konstrukcyjną i instalacyjną 6. Symbole ścian i elementów, odnoszą się do opisu specyfikacji architektonicznej. 7. Rysunek należy rozpatrywać łącznie z projektami branżowymi: konstrukcyjnym, instalacji sanitarnych, instalacji elektrycznych i instalacji teletechnicznych. Pozycja i wymiarowanie elementów konstrukcyjnych wg. dokumentacji konstrukcyjnej.

114

DŹWIG D

735

EF-3 / 5

EB-3

785

Toal.Męs. przedsionek 10,61 m²

UH-5/GP-2

12.04

4

Korytarz kl.2 9,74 m²

ET-1/SM-18/T3

EF-3 / 6

823-02

Wg

67 8

1

823-02

EF-3 / 1

10x17.25 28

LICOWAĆ

Wg

LICOWAĆ ET-1/SM-18/T4

WYRÓWNANIE TYNKIEM USKOKU POMIĘDZY ŚCIANĄ MUROWANA I ŻELBETOWĄ

ET-1/SM-18/T3

2

823-02

ET-1/SM-18/T3

Wg

2

823-02

Wg

5

823-01

12.14 893,3 m² Pow. Biurowa 2 Pd PP-1 Ck Sc WS-m4 Sf SF-m1

WS-tk2

810

ET-1/SM-18/T3

6

Wg

823-01

EB-3

10

831-01

Wg

831-01

2

Rozdzielnia elektr. 0,54 m²

6

831-01

ET-1/SM-18/T3

Wg

UH-2/GP-6

T1

T1 Sz-k

RYBCENT DELAP&WALLER REO PROJEKTANT INSTALACJI SANITARNYCH

DELAP&WALLER INSTAL WARSZAWA

311-02

UH-2A/GP-6

EF-1 / 4

Strefa wzmocnionego stropu

12

831-01

9

831-01

Wg

2

Wg

823-02

9

PROJEKT

BUDYNEK BIUROWY ETAP I DZ.NR EW. 32/2, UL RÓWNOLEGŁA 4A WARSZAWA W ZESPOLE BIUROWYM - ETAP I, II, III UL. RÓWNOLEGŁA, WARSZAWA

Wg FAZA

AUTORZY

EF-3 / 3

WS-tk2

WSPÓŁPRACA

4

823-01

Wg

Wg

2

823-02 ET-1/SM-18/T3

ET-1/SM-18/T3

Wg

2

823-02 ET-1/SM-18/T3

3

823-01

ET-1/SM-18/T3

Wg ET-1/SM-18/T3

ET-1/SM-18/T3

EB-3

405 105

EB-3

EF-3 / 4 485

EF-3 / 3 50

810

760

EB-3

EF-3 / 3 50

810

760

EB-3

EF-3 / 3 50

810

760

bolero

C

D

EF-3 / 3 50

760

810 5825

B

EB-3

E

EB-3

EF-3 / 3 50

810

1 201-01

760

EB-3

EF-3 / 3 50

810

EB-3

760

67 8

810

50

301-01

Wg

10

PROJEKTANT SPRAWDZAJĄCY TREŚĆ RYSUNKU

NR TEMATU

1

F

1

823-02

50

LICOWAĆ

ET-1/Sz-k/T2

38

Wg

8 67

50

LICOWAĆ

ET-1/SM-18/T4

52,5

10

2

823-02

WYRÓWNANIE TYNKIEM USKOKU POMIĘDZY ŚCIANĄ MUROWANA I ŻELBETOWĄ

G

H

PROJEKT WYKONAWCZY

BRANŻA

ET-1/SM-18/T3

810

PRC ARCHITEKCI

PROJEKTANT INSTALACJI ELEKTRYCZNYCH

1

Sz-k

TREŚĆ

PROJEKTANT KONSTRUKCJI

EF-3 / 3

50

1720

1615

T1 Sz-k

Wymagania ppoz/ wykonczenie pom - zmiany wg T-02 rew. W.01

DATA

ARCHITEKT/GENERALNY PROJEKTANT

422-01

Wg

05.07.2013

NUMER

BOLERO INVESTMENT

GP-6

311-01

1

ET-1/SM-18/T3

INWESTOR

12.16 Korytarz Ewakuacyjny 32,74 m²

1

9

16,52 m²

12.17

8

8

12.05

Klatka schod.2

10x17.25 28

12.15 Pow. Biurowa 2.2 6,14 m²

WYKONANIE KORYTARZA EWAKUACYJNEGO WYMAGANE W PRZYPADKU BRAKU UZGODNIONEJ W RAMACH ODDZIELNEGO WYSTĄPIENIA ARANŻACJI POW. BIUROWEJ

PP-1

+20.700 +20.550 +13.800 +13.650 +6,900 +6,750

10x17.25 28

Wg

760

4

821-01

Wg

EB-3

760

8

N

50

760

J

ARCHITEKTURA ANDRZEJ MICHALIK NR LIC. 047937C ANDRZEJ JURKIEWICZ MA/014/04 IGOR GALAS WŁ-26/00 DOMINIKA ARCZEWSKA AGATA ŻAK STEFAN LENNON WALDEMAR NOWICKI PRZEMYSŁAW OLSZEWSKI JAKUB PSTRAŚ CEZARY ALKA LENA SZYDŁOWSKA WA 484/01 PODPIS

ANDRZEJ JURKIEWICZ MA/014/04 PODPIS

IGOR GALAS WŁ-26/00

PIĘTRO +2, +4. RZUT. BRANŻA

309 A

SKALA

1 : 100

NR RYSUNKU

REWIZJA

112-01 W.01

DATA

10.06.2013

C:\Users\dominikaz\Documents\Revit Local\309_ROWNOLEGLA_dominikaz.rvt

50

EF-3 / 1

EB-3

12.10

760

760

358

810 50

2013−07−09 17:10:33

EF-3 / 1

EB-3

835

3295

1

67 8

EF-3 / 2

ET-1/Sz-k/T2

760

810

217,5

50

52,5

ET-1/SM-18/T4

810 485,8

1720

810 404,3

810

137,5

203-02 105


najostrzejsze. 3. Nie wolno brać wymiarów ze skali. Obowiazują wymiary podane. W przypadku rozbieżności pomiędzy stanem na budowie a rysunkami lub pomiędzy poszczególnymi rysunkami należy skonsultować się z inspektorem nadzoru. 4. Niedopuszczalna jest swobodna interpretacja wynikająca z zauważonych nieścisłości. 5. Rysunek należy rozpatrywać łącznie ze specyfikacją architektoniczną, konstrukcyjną i instalacyjną 6. Symbole ścian i elementów, odnoszą się do opisu specyfikacji architektonicznej. 7. Rysunek należy rozpatrywać łącznie z projektami branżowymi: konstrukcyjnym, instalacji sanitarnych, instalacji elektrycznych i instalacji teletechnicznych. Pozycja i wymiarowanie elementów konstrukcyjnych wg. dokumentacji konstrukcyjnej.

4

5

6

8

9

10

Dach Poziom Techn.

3

+26,95

+24,950

ET-1

EB-4

ET-1

200

Attyka +24,95 Dach

88

31

6 182

129

6

+24,950

EB-4

6

SL-a1

80

SL-a1

197

EZ-1

+24,15

EF-3 / 6

EF-1 / 4

EF-3 / 6

EF-1 / 4

EB-2

345

EF-3 / 8

EF-2 / 3

300

EF-1 / 3

290

EF-3 / 8

6

EF-1 / 3

152

EB-2

Piętro +6 EB-1

+20,70

45

187

46

EB-1

EB-1

345

300

EB-2

6

152

EB-2

EF-2 / 2

Piętro +5 EB-1

+17,25

45

187

644

ET-1 EB-1

EF-3 / 6

EF-1 / 4

345

EF-3 / 8

EF-1 / 4

EB-2

300

EF-1 / 3

EF-3 / 6

6

EF-1 / 3

EF-3 / 8

152

EB-2

Piętro +4 EB-1

+13,80

45

46

EB-1

187

EB-1

345

300

EB-2

1

6

152

EB-2

EF-2 / 2

ET-1

Piętro +3 EB-1

05.07.2013

NUMER

+10,35

45

187

644

ET-1 EB-1

Wymagania ppoz/ wykonczenie pom - zmiany wg T-02 rew. W.01

DATA

TREŚĆ

INWESTOR

BOLERO INVESTMENT EF-3 / 6

EB-2

PRC ARCHITEKCI

6

EF-1 / 4

ARCHITEKT/GENERALNY PROJEKTANT

345

PROJEKTANT KONSTRUKCJI

ET-1

Piętro +2

RYBCENT

+6,90

6

PROJEKTANT INSTALACJI ELEKTRYCZNYCH

DELAP&WALLER REO

EP

95,5

85

O1

EP

EP

O1

EZ-2

EP

EP

85

95,5

DELAP&WALLER INSTAL WARSZAWA PROJEKT

Piętro +1

BUDYNEK BIUROWY ETAP I

+3,45

45

EB-1

821-02

CCTV-k2

EF-1 / 2

D.10.15A

-0,020

EP

D.10.15F

D.10.13A

133,8 / 216,9 -

EF-1 / 1

239 / 301,9 -

825-03 EP

4

EZ-2

133,8 / 216,9 -

EZ-2

90

EZ-2

215

6

CCTV-k2

CCTV-k2

644

842-01

EB-1

ET-1

PROJEKTANT INSTALACJI SANITARNYCH

DZ.NR EW. 32/2, UL RÓWNOLEGŁA 4A WARSZAWA W ZESPOLE BIUROWYM - ETAP I, II, III UL. RÓWNOLEGŁA, WARSZAWA FAZA

345

EF-2 / 1

2

ET-1

119

CCTV-k2

CCTV-k2

345

EF-1 / 4

300

EF-3 / 6

85

EF-3 / 8

EF-1 / 3

EP

215

152

2

823-02

EB-2

-0,020

Parter

1

45

90

45

90

90

45

90

45

95,5

1

1

ARCHITEKTURA

AUTORZY

ANDRZEJ MICHALIK NR LIC. 047937C UWAGI OGÓLNE: ANDRZEJ JURKIEWICZ MA/014/04 1. Obowizkiem kadego wykonawcy jest WŁ-26/00 IGOR GALAS rozpatrywanie niniejszego WSPÓŁPRACA rysunku z innymi rysunkami branowymi odnoszcymi do DOMINIKA si ARCZEWSKA konkretnego obszaru. W razie stwierdzenia AGATA ŻAK jakichkolwiek rozbienoci zgłosi nadzorowi STEFANjeLENNON autorskiemu przed przystpieniem do pracy. Dotyczy WALDEMAR NOWICKI to w szczególnoci wystpowania kolizji wOLSZEWSKI PRZEMYSŁAW usytuowaniu poszczególnych i wszystkich JAKUB PSTRAŚ przewodow i urzadze instalacyjnych oraz CEZARY ALKA zachowania wszystkich wymaganych odlegloci i LENA SZYDŁOWSKA WA 484/01 przewitów. Wszystkie widoczne lub ukryte elementy winny by okrelone i zaaprobowane przez inwestora PODPIS PROJEKTANT przed montaem. ANDRZEJ JURKIEWICZ MA/014/04 2. Kada z robót winna spełnia wymagania PODPIS SPRAWDZAJĄCY wszystkich urzedów stanowicych normy i przepisy. IGOR GALAS WŁ-26/00 W przypadku wtpliwosci obowizuj przepisy TREŚĆ RYSUNKU najostrzejsze. ELEWACJA ZACHODNIA 3. Nie wolno bra wymiarów ze skali. Obowiazuj wymiary podane. W przypadku rozbienoci pomidzy stanem na budowie a rysunkami lub pomidzy poszczególnymi rysunkami naley skonsultowa si z inspektorem nadzoru. NR TEMATU BRANŻA NR RYSUNKU REWIZJA 4. Niedopuszczalna jest swobodna interpretacja wynikajca z zauwaonych niecisłoci. 5. Rysunek naley rozpatrywa łcznie ze specyfikacj architektoniczn, konstrukcyjn i SKALA DATA instalacyjn 1 odnosz : 100 si do opisu 10.06.2013 6. Symbole cian i elementów, specyfikacji architektonicznej. 7. Rysunek naley rozpatrywa łcznie z projektami branowymi: konstrukcyjnym, instalacji sanitarnych, instalacji elektrycznych i instalacji teletechnicznych. Pozycja i wymiarowanie elementów konstrukcyjnych wg. dokumentacji konstrukcyjnej.

+0,00 95,5

PROJEKT WYKONAWCZY

BRANŻA

1

309 A

4

5

6

8

9

200-01 W.01

C:\Users\dominikaz\Documents\Revit Local\309_ROWNOLEGLA_dominikaz.rvt

EB-1

45

46

EB-1

187

EB-1

EB-2

2013−07−09 16:25:11

EF-3 / 8

EF-1 / 3

300

152

EB-2

10

3

11 1 301

5

80 195 150 195 150 195

345 345 345 345 345

432

6

-0,150



-0,550

-3,500



Parter

  

±0.00= 32.25 mnpw. +0,00 

-0,850 350

IZ-2.10 -0,950

Poziom -1 -3,50



1 301







PB-3

image by @monokolor

  

D-5

D-4

  



345 -0.02= 32.23 mnpw. +0,000

83

+0,000

 

+3,45

4

-0,400

IZ-2.10

PB-3

PB-3

345

40

Pitro +1

305 PP-1

±0.00= +0,000 32.25 mnpw.

-0,400

IZ-2.10

200

197,5 186

40 305



+3,300

50

-0,150



 

+3,050

50

+0,000





+6,90



302

IZ-2.10

PB-3

Pitro +2

  

            

 

















 



  



78

60

40

50 -0,400

+3,450

+3,050 Sf-md1

302

IZ-2.10

78

-0,500

-0,850 -0,950

+6,750

+6,500

PP-1 +0,000 -0,150 ±0.00= 32.25 mnpw.

+10,35

+6,100

640

80

50 -1,100

-3,520 -3,600 20 58

PK-2

Pitro +3



+6,900

Sl-b6

302

267

350

-0,850

SF-tg1

PP-2

302

85

-0,550

+2,650

50

±0.00= 32.25 mnpw. +0,000 -0,150

-0.02=32.23 mnpw. -0,020

Parter +0,00

Sf-md2

PP-1

+3,050

265

305

D-5

Wg

7

Sl-b7

+2,650

78

D-5

+10,350 +10,200

60

40

PP-1

40

215

345

Wg

PP-1



+3,300

+3,050

215

7



SF-tg3



+3,450

Pitro +1 +3,45

+6,400 +6,500

7

305

345

150

+6,500

+13,80

+9,950

PK-1

+6,900 +6,830

40

195

+6,750

PP-1

Pitro +4

+9,550

305

345

150

+6,900

Pitro +2

Sf-md2

195

Sl-b7

150

PP-1

+9,950

+6,90

+13,800 +13,650

+13,400

+13,000

640

+10,200

PP-1

Sf-md1

150

PP-1

Wg

7



+17,25

267

305

345

150 195

PK-1

SF-tg3

Pitro +5

+16,850 +16,450

50 +13,300 +13,400

Wg

+20,70

+17,100

150

+13,800 +13,730

7

 +10,350

Pitro +3 +10,35

+17,250

20 58

PP-1

40

195

+13,650

Pitro +6

195

Sf-md1

+13,400

68 22 21 305

PP-1

305

345

150

+13,800

Pitro +4

+20,550

+20,300

Sl-b7

+16,850

+13,80

+20,700

305

PP-1

40

PP-1

Dach +24,15

+19,900

640

+17,100

150

Sf-md1

4

206

Wg



40

195

7

PK-1

SF-tg3

Attyka +24,95

+23,750

+23,350

305

305

345

150

 +17,250

Pitro +5

Sf-md2

50

40

+20,200 +20,300

+20,300

+17,25

230

+20,700 +20,630

Wg

40

Wg

PP-1 +20,550

7



305

7

SF-tg3 295

Wg

+26,95



40

21 305

345

150 195

7

 +20,700

Pitro +6

2,25%

2,25%

100 +23,650 +23,750

+23,750

+20,70

D-1

305

2,25%

2,25%

+24,435

90

+24,15

D-1

78

206

197,5

280

5

EZ-1 D-1

186

+24,95 Dach

Dach Poziom Techn.

8

8

+26,950

6



4

Attyka





+26,950

Dach Poziom Techn. +26,95

bolero

39


RYDYGIERA a proposal for a competition held by the investor. housing complex with various apartment types, shared zones and playgrounds. I’ve been a part of the team working on it, while employed at PRC Architekci. Our proposal was awarded 3rd place.

40

rydygiera

image by antoni rybinski

Warsaw, Poland / 2015


image by @monokolor

rydygiera

41


image by @monokolor

42

rydygiera


rydygiera

43


44


THANK YOU VERY MUCH FOR YOUR ATTENTION! For more information, contact me at aleksandra.norman@gmail.com and visit http://www.shivers.design

45


Aleksandra Norman selected works

2015 - 2018

46

Portfolio Aleksandra Norman  

a portfolio of selected works of interior design, by Aleksandra Norman. Years 2016-2018

Portfolio Aleksandra Norman  

a portfolio of selected works of interior design, by Aleksandra Norman. Years 2016-2018

Advertisement