Page 1

A R C H I T E C T U R E P O RT F O L I O

ALEC PARCELL


A L E C PA R C E L L alecparcell@live.co.uk +44(0)7896902128

A R C H I T E C T U R E P O RT F O L I O


C O NT E NT S OXFO R D S CH O O L O F A R CH I T E CT U R E RU RAL S C HO O L G AHI N I 1 C AVAL C AN TE U RB AN P L AN B RAZ I L 3 S E ATTL E VI AD U C T AN D P I E R RE G E N E RATI O N U S A 4 CH A P M A N TAY LO R AL M AK TO U M I N TE RN ATI O N AL AI RP O RT D U B AI S T PAN C RAS I N TE RN ATI O N AL S TATI O N LONDON K N I G HTS B RI D G E S C HO O L B AK U

5 7 9

CO M P E T I T I O N S U N I VE RC I TY I S L AN D VE N I C E 1 2 0 HRS C O M P E TI TI O N S VAL B ARD

11 13

P O RT S M O U T H S CH O O L O F A R CH I T E CT U R E FO O D B AN K + S O U P K I TC HE N

15

P O RTS M O U TH

A R C H I T E C T U R E P O RT F O L I O


AC AD E M IC WORK - MArc h D BI O - D I G I TAL C R AFT RU R A L S C HOOL , G A H IN I, RWA NDA

2

1 3

1

A R C H I T E C T U R E P O RT F O L I O

4

1 2 3 4

Product life cycle Brick arch formation Clay printed pot Clay printed ventilation brick


1

2

1 2

Library construction Library situated on-site

A R C H I T E C T U R E P O RT F O L I O

2


AC AD E M IC WORK - MArc h D UR B AN D ES I G N C AVA L C A N T E U R B A N PL A N, BR A ZIL

1 2

3

A R C H I T E C T U R E P O RT F O L I O

3 4 5

1 2 3 4 5

Existing structures Infill structrures Future extensions Combined masterplan Street scene


AC AD E M IC WORK - MArc h D UR B AN D ES I G N SE AT T L E V I AD U CT A ND PIER R EG ENERATIO N, U S A

1 2 3 4

1 2

3

Pier regeneration Urban disconnect Garden bridge View from garden bridge

4

A R C H I T E C T U R E P O RT F O L I O

4


C H APM A N TAYLOR AL MA K TO U M IN T ER N AT IONA L A IRPO RT

2 1 4

5

A R C H I T E C T U R E P O RT F O L I O

5

3 6

1 2 3 4 5 6

Node IDL Plan Node Void Space Node VCC Area Leisure Level Lounge Level IDL Level


2

1

3 4 6

5 7

1 2 3 4 5 6 7

Node IDL Node Mall Node Dwell Area Swirl Concept Figure 8 Concept Loop Concept Interlock Concept

Project Brief: Retail masterplanning of the concourse and lounge areas of 12 node terminals at Al Maktoum International with the focus on catering for long haul transfer passengers as the airport bids to be a global super hub.

A R C H I T E C T U R E P O RT F O L I O

6


C H APM A N TAYLOR ST PAN C R A S I NT ER NAT IONA L STATIO N

135

St Pancras Station Masterplanning Study High Speed 1

Project No 70018714

St Pancras Station Masterplanning Study High Speed 1

St Pancras Station Masterplanning Study High Speed 1

7

A R C H I T E C T U R E P O RT F O L I O

Project No 7001

Project No 70018714

1

3

2

4

1 2 3 4

Minimum Works Reconfiguration Concourse Minimum Works Reconfiguration Platform Taxi Rank Commercialisation Concourse Unit Expansion


60

133

St Pancras Station Masterplanning Study High Speed 1

1

3 4

2

1 2 3 4

St Pancras Station Masterplanning Study High Speed 1

Project No 70018714

Maximum Works Reconfiguration Concourse Maximum Works Reconfiguration Platform Concourse Seating Concourse Seating

St Pancras Station Masterplanning Study

High Speed 1 Study St Pancras Station Masterplanning High Speed 1

Project Brief: Pinch point analysis and reconfiguration of Eurostar Check-in procedure to increase capacity for the outlined future expansion of European services from St Pancras International. Provision of additional commercial area throughout the building to increase revenue. Project No 70018714

Project No 70018714

A R C H I T E C T U R E P O RT F O L I O

8Project No 7


11

10

9

8

A

B

C

D

E

F

Store Room F

G

Changing Room G

11

10

9

8

7

6

5

4

3

2

1

A

H

H

B

I

I

Stair Core C

J

J

7

D

Classroom K

K

2

Traffic Consultant: WSP House 70 Chancery Lane London WC2A 1AF T: +44 (0)207 314 5000 F: +44 (0)207 314 5111

Drawing Title:

BAKU KNIGHT Ground Floor Iso

Drawing Title:

Project Description:

BAKU KNIGHTSBRIDGE

First Floor Iso 2

Status:

Tender / Construction / As-Built / For Information

Owner:

Project Description:

Rev.

Description

Owner:

PASHA Insaat Construction Manager:

Drn.

Ckd. Appd. Date

N

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

PASHA INSAAT MMC.

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

PASHA INSAAT MMC.

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

Chapman Taylor

URAL Engineering Co. Inc

Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

Structural Engineer:

Akpınar Mahallesi Dikmen Caddesi No:538/14 Çankaya, 06460 Ankara, Turkey T: +90 (312) 475 2848 F: +90 (312) 475 2844 e-mail:info@ural.comtr

Black & White Engineering Limited Unit 2.8 First Floor Generator Studios Trafalgar Street Newcastle upon Tyne NE1 2LA T: +44 (0)191 230 0206 e-mail:enquiries@bw-engineering.com

H+H Fire

WSP House 70 Chancery Lane London WC2A 1AF T: +44 (0)207 314 5000 F: +44 (0)207 314 5111

Approved by: Checker Scale:

Sheet:

Rev:

1 : 150 @A1 of:

-

Approver

41-42 London Wall London EC2M 5TB T: +44 (0)207 193 2990 e-mail:glennhorton@hhfire.com

BAKU KNIGHTSBRIDGE

Checked by:

Orginal Sheet Size:

Author Client Project Code:

-

© COPYRIGHT CHAPMAN TAYLOR 2015

-

A1 AR - BKN -

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

THIS DRAWING MUST NOT BE SCALED.

-

Drawing Number:

1330

Drawn by:

Tender / Construction / As-Built / For Information

Status:

School_Level 1

Drawing Title:

Project Description:

Fire Engineer:

Services Engineer:

PASHA Insaat

9

WSP Group (London)

Architect:

10

Traffic Consultant:

11

Rev.

Description

Owner:

PASHA Insaat Construction Manager:

PASHA Insaat

Drn.

Ckd. Appd. Date

N

PASHA INSAAT MMC.

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

PASHA INSAAT MMC.

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

URAL Engineering Co. Inc

Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

Chapman Taylor

Structural Engineer:

Black & White Engineering Limited

Architect:

Services Engineer:

WSP Group (London)

H+H Fire

WSP House 70 Chancery Lane London WC2A 1AF T: +44 (0)207 314 5000 F: +44 (0)207 314 5111

Unit 2.8 First Floor Generator Studios Trafalgar Street Newcastle upon Tyne NE1 2LA T: +44 (0)191 230 0206 e-mail:enquiries@bw-engineering.com

Akpınar Mahallesi Dikmen Caddesi No:538/14 Çankaya, 06460 Ankara, Turkey T: +90 (312) 475 2848 F: +90 (312) 475 2844 e-mail:info@ural.comtr

Traffic Consultant:

Fire Engineer:

Checked by:

-

Sheet:

Rev:

1 : 150 @A1 of:

Scale:

Approved by: Checker

-

© COPYRIGHT CHAPMAN TAYLOR 2015

Approver

41-42 London Wall London EC2M 5TB T: +44 (0)207 193 2990 e-mail:glennhorton@hhfire.com

BAKU KNIGHTSBRIDGE

Project Description:

Drawing Title:

School_Level 0

Status:

Author

Orginal Sheet Size:

Drawn by:

Tender / Construction / As-Built / For Information

Client Project Code:

A1 AR - BKN -

-

1330 -

Drawing Number:

THIS DRAWING MUST NOT BE SCALED.

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR. AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

K

PASH Insaa Construction Manager:

Structural Engineer:

PASH Insaa

Traffic Consultant:

Drawing Title:

Fire Engineer:

2

Second Floor Iso

Status:

BAKU

A1 1330

O Client Project Code:

Tender / Construction C

L M ONCE PRINTED AND DISRIBUTED THIS DOC © All rights reserved. No part of this drawing may be re

6

Author Drawn by:

© COPY THIS DRAWING MUST NOT BE SCALED.

Drawing Number:

Orginal Sheet

Checked by:

-

THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE L M N AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder.

7

Services Engineer:

4

Description Rev.

4 2

Architect:

5

Owner:

Ground Floor Aerial View First Floor Second Floor 1 2 3 4 3 8

1

L M N ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permis

K J I H G F E D C B A

11

AR - BKN ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

U

THE L M N E F G H BASIS OF THESE PREDICTIONS, WHETHER ASITO PROJECT VIABILITY, PRE-LETTING, LEASE J AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder.

Status:

Fire Engineer:

3 41-42 London Wall London EC2M 5TB T: +44 (0)207 193 2990 e-mail:glennhorton@hhfire.com

Architect:

5

Author Drawn by: of:

Client Project Code:

Sheet: @A1

1 -

Scale:

A1 1330

© COPYRIGHT CHAPMAN TAYLOR 2015 THIS DRAWING MUST NOT BE SCALED.

-

AR - BKN -

Orginal Sheet Size: Client Project Code:

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Black & W

WSP Group (London)

Structural Engineer: Akpınar Mahallesi Dikmen Caddesi No:538/14 Çankaya, 06460 Ankara, Turkey T: +90 (312) 475 2848 F: +90 (312) 475 2844 e-mail:info@ural.comtr

PASHA Insaat 6 T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Services Engineer:

Black & White Engineering Limited

Traffic Consultant:

Tender / Construction / As-Built / Approver Approved by: Checker Checked by: Author Drawn by:

Rev: Drawing Number:

1

H+H Fire Fire Engineer:

3

URAL Engineering Co. Inc Structural Engineer:

4 Unit 2.8 First Floor Generator Studios Trafalgar Street Newcastle upon Tyne NE1 2LA T: +44 (0)191 230 0206 e-mail:enquiries@bw-engineering.com

Services Engineer:

4

7

6

5

4

3

2

1

11

10

9

Classroom

Construction Manager: Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

PASHA Insaat

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON OR BECOME APPARENT SHOULD BE REPORTED TO CHAPM

Baku Knightsbridge School/Court 4 | Stage A/B Report Baku Knightsbridge School/Court 4 | Stage A/B Report

12

Corridor

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL A AREAS OF THE BUILDING AT THE CURRENT STAGE OF DES THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PRO AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOW DECREASES INHERENT IN THE DESIGN DEVELOPMENT AN

L M N ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder.

K J I H G F E

D

C

B

Toilets

PASHA Insaat Architect:

5

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS.

A

9

Corridor

1:300 @ A3 Second Floor Plan FFL -5.0m

Toilets PASHA INSAAT MMC. Construction Manager:

Description Rev.

PASHA INSAAT MMC. Owner:

Ckd. Appd. Date Drn. Description Rev.

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

PASHA Insaat 6

Admin Suite N

10

Level 2 10

Stair Core Library / ICT

1:300 @ A3 Ground Floor Plan FFL -13.0m

Chapman Taylor Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

-13.0m

Cloakroom E

9

-13.0m

Entrance D

11

11

-17.0m

Stair Core C

-13.0m

Teaching Space

1:300 @ A3 First Floor Plan FFL -9.0m

Teaching Space

Level 1 Level 0

Project Description:

A R C H I T E C T U R E P O RT F O L I O

8

7

6

5

4

3

B

K N I G H T S B RI D G E B A K U SCH OOL

3

9

2

1

A

C H APM A N TAYLOR

First Aid

Reception

Toilets

Kitchen / Servery

Hall

Classroom

8

8

7

Reception


Level 0 -13.000

Level B1 -17.000

orth Section

1

2

3

4

5

6

7

Rev.

Description

Drn.

Owner:

Ckd. Appd. Date

PASHA INSAAT MMC. Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

PASHA Insaat

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Construction Manager:

PASHA INSAAT MMC. Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

PASHA Insaat

Level 5 +3.800

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Chapman Taylor

Architect:

Level 3

Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

+1.000

URAL Engineering Co. Inc

Structural Engineer:

Level 2

Akpınar Mahallesi Dikmen Caddesi No:538/14 Çankaya, 06460 Ankara, Turkey T: +90 (312) 475 2848 F: +90 (312) 475 2844 e-mail:info@ural.comtr

h Section -3.000

Services Engineer:

Black & White Engineering Limited

Traffic Consultant:

WSP Group (London)

Unit 2.8 First Floor Generator Studios Trafalgar Street Newcastle upon Tyne NE1 2LA T: +44 (0)191 230 0206 e-mail:enquiries@bw-engineering.com

Level 1 -7.000

A3

WSP House 70 Chancery Lane London WC2A 1AF T: +44 (0)207 314 5000 F: +44 (0)207 314 5111

Level 0

11

H+H Fire

-13.000

Fire Engineer:

Level B1

Project Description:

41-42 London Wall London EC2M 5TB T: +44 (0)207 193 2990 e-mail:glennhorton@hhfire.com

BAKU KNIGHTSBRIDGE

-17.000 Drawing Title:

Section AA / BB

Central Section

1

2

3

4

N

Status:

Tender / Construction / As-Built / For Information

10

Drawn by:

Author

Client Project Code:

Approved by: Checker

Orginal Sheet Size:

1330

Level 5

Scale:

A1

-

Level 3

Approver Sheet:

1 : 150 @A1 of: Rev:

Drawing Number:

+3.800 9

Checked by:

AR - BKN -

THIS DRAWING MUST NOT BE SCALED.

-

-

-

© COPYRIGHT CHAPMAN TAYLOR 2015

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

+1.000 C

D

E

F

G

H

I

Level 2

J

K

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE L M N AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder.

-3.000

Level 1

8

-7.000

Level 0 -13.000

7

N

Level B1 -17.000

1 6

2 4

3

5

1 2 3 4 5

Central Section Entrance View Car Park Section Rear View Street Elevation

Project Brief: Design for the school to sit within Baku Knightsbridge residential development. Prep school for children from the local area designed over 5 levels and with expansive green space to the rear of the school hall.

Baku Knightsbridge School/Court 4 | Stage A/B Report

17

Rev.

Description

Drn.

Owner:

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

PASHA Insaat

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Construction Manager:

PASHA INSAAT MMC. Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

PASHA Insaat 5

Ckd. Appd. Date

PASHA INSAAT MMC.

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Architect:

A R C H I T E C T U R E P O RT F O L I O Structural Engineer:

Chapman Taylor Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

10

URAL Engineering Co. Inc


C O M PE T IT ION WORK Un i ve rC ity I s land WIT H HA A KO N L IE A ND A L EX PAUL

Smart Construction

Visual Connection

+

Traditional and Modern

New canals

4 1 5

6

3

8

7

2

13 11

7

17 9 15

7

10

14

16 11 12

11

A R C H I T E C T U R E P O RT F O L I O

1

Main Arrival

10

Cafeteria/Canteen

2

Sports Centre

11

Library

3

Swimming Facilities

12

Performance Island

4

Teachers Wing

13

The Boat House

5

The Beach

14

Classrooms

6

Garden

15

Exhibition Space

7

Student Housing

16

Tourist/Leisure Arrival

8

Activity Centre/Student Bar

17

Gondola Boat House

9

Student Union


Project Brief: The habitation of an abandonned island to form a unique university campus in the Venetian Lagoon which promotes a healthy lifestyle and combines world class teaching facilities with an unrivalled living and recreation experience.

A R C H I T E C T U R E P O RT F O L I O

12


C O M PE T IT ION WORK 1 2 0 HR S C OM PET IT ION

MINING

WIT H K S AWE RY SA BB AT

13

A R C H I T E C T U R E P O RT F O L I O

C U LT U R E

PORT

N AT I O N A L PA R K

ROUTES OF DEVELOPMENT


EXISTING SITE

DEMOLITION PROPOSAL

KEY ROUTES

BOARDWALK PHASE 1

BOARDWALK PHASE 2

STRUCTURAL PRESERVATION

HELIPORT AND PORT

1

2 4 6 8

3 5 7 9

1 2 3 4 5 6 7 8 9

Site Organisation Existing Site Demolition Proposal Key Routes Raised Walkway Phase 1 Raised Walkway Phase 2 Structural Preservation Transport Links Overall Proposal

FINAL PROPOSAL

Project Brief: A competition brief designed to question the notion of preservation or conservation in the town of Pyramiden on Svalbard, Norway. From its historic mining roots through to an outpost of WW2 how do you narrate the story of the people who once called the place home.

A R C H I T E C T U R E P O RT F O L I O

14


AC AD E M IC WORK F OO D B A N K + SOUP K IT CH EN

14

15 + SECOND FLOOR

13 12

11

12 13 14 15

Gallery Offices Staff Toilets Staff Room

+ FIRST FLOOR

10

7 8 9 10 11

9 8

Dining Area Kitchen Training Rooms Medical Centre Public Toilets

7

5 6 4

3 2

1

+ GROUND FLOOR 1 2 3 4 5 6

Market Hall Donation Receiving Area Laundry Room Foodbank Plant Room Business Entrance

entrance

external glazed walkway

east elevation

2 1

15

A R C H I T E C T U R E P O RT F O L I O

3

1 2 3

Axonometric Arrangement Sectional Perspective East Elevation

1

2

5m


1

2 3

4

1 2 3 4

Foodbank + Soup Kitchen Site Model Site Model View Corridor Site Plan

Project Brief: The design of a foodbank and soup kitchen to cater for the community in the surrounding, which forms one of the most deprived areas in the UK. The centre is designed to integrate all surrounding communities and develop prosperity on an upward spiral.

site plan

2 4

10m

A R C H I T E C T U R E P O RT F O L I O

16


A L E C PA R C E L L alecparcell@live.co.uk +44(0)7896902128

A R C H I T E C T U R E P O RT F O L I O

Architecture Portfolio  
Architecture Portfolio  
Advertisement