Project

City

Facility

ENOC- Al Maktoum Airport- Jet Fuel Pipeline Expansion

Dubai

Jet Fuel Pipeline

Budget ($ US) 250,000,000

ENOC-Fujairah Refinery

Fujairah

Refinery

Fujairah Port - Port Facilities Expansion

Fujairah

Oil Storage Tanks

100,000,000

Status FEED Design Construction

GASCO - Abu Dhabi Sales Gas Network- Compression Station

Abu Dhabi

Gas Pipeline

900,000,000

GASCO - Black Powder Management

Abu Dhabi

Gas Pipeline

44,000,000

Construction

GASCO - Habshan to Ruwais 16 inch Condensate Replacement Pipeline

Abu Dhabi

Gas Pipeline

90,000,000

Construction

GASCO - Habshan-Maqta-Taweelah Gas Pipeline

Abu Dhabi

Gas 500,000,000

GASCO - Integrated Gas Development (IGD) Expansion (Onshore Pipeline)

Abu Dhabi

Gas Production

12,000,000,000

GASCO - Taweelah - Gas Compressor Station

Abu Dhabi

Gas Processing

70,000,000

GASCO - Yas - Mina Zayed Gas Pipeline

Abu Dhabi

Gas Processing

45,000,000

GASCO Gas Turbine Replacement (Phase 1 - Asab & Buhasa)

Abu Dhabi

Gas Processing

130,000,000

Feasibility Study

Construction Construction Engineering & Procurement Construction FEED

GASCO- Habshan 5 - New Compression Train

Abu Dhabi

Gas Processing

800,000,000

EPC ITB

GASCO- Integrated Gas Development Expansion (42 Inch Pipeline)

Abu Dhabi

Oilfield Development

450,000,000

Construction

Gulf Petrochem - Fujairah - Bitumen Refinery

Fujairah

Bitumen

300,000,000

Design

Gulf Petrochem Oil Storage Terminal Facility at Fujairah - Phase 2

Fujairah

Oil Storage Tanks

300,000,000

EPC ITB

3,500,000,000

EPC ITB

IPIC & Mubadala- Fujairah Refinery (EPC 1 & 2)

Fujairah

Refinery

MASDAR - Carbon Dioxide Capture and Storage Phase I (Mussafah Steel Rolling Mill)

Abu Dhabi

Carbon Dioxide

280,000,000

Construction

MASDAR - Carbon Dioxide Capture and Storage Phase 2 (Pipeline Network)

Abu Dhabi

Carbon Dioxide

300,000,000

Design

MASDAR - Carbon Dioxide Capture and Storage Phase I (Overview)

Abu Dhabi

Carbon Dioxide

2,500,000,000

Construction

MASDAR - Carbon Dioxide Capture and Storage Phase I (Pipeline Network)

Abu Dhabi

Carbon Dioxide

280,000,000

Construction

Petrixo Oil & Gas - Fujairah Bio-Fuel Refinery

Fujairah

Biofuel Refinery

Primestar Energy - Prime Tank Terminal & Jetty Pipeline

Fujairah

Oil Storage Tanks

Saif Al Khaili & KIZAD - Emirates Chemical Plant

Abu Dhabi

Caustic Soda

Sharafco - Hamriyah Free Zone - Storage Terminal

Sharjah

Oil Storage Tanks

100,000,000

EPC ITB

Star Energy Group- JAFZA Expansion 7A

Dubai

Oil Storage Tanks

200,000,000

Construction

Takreer - Abu Dhabi International Airport Expansion Aviation Fuel Depot

Abu Dhabi

Oil Storage Tanks

100,000,000

Construction

Takreer- Carbon Black Plant

Abu Dhabi

Polymers

200,000,000

Construction

Takreer- Hamriya Jetty and Pipeline Network Project Marine Works 2

Sharjah

Oil Storage Tanks

250,000,000

Construction

Takreer- IRP - Phase 3

Abu Dhabi

Refinery

200,000,000

FEED

Takreer- Processing Offshore Crude Project

Abu Dhabi

Refinery

10,000,000,000

EPC ITB

Takreer- Ruwais Refinery East - Construction of Additional Outfall

Abu Dhabi

Refinery

350,000,000

EPC ITB

Takreer- Ruwais Refinery East- SRU Replacement

Abu Dhabi

Refinery

100,000,000

EPC ITB

Takreer- Ruwais- LPG Recovery

Abu Dhabi

Refinery

40,000,000

Takreer- Waste Heat Recovery

Abu Dhabi

Refinery

150,000,000

Takreer-Ruwais East Refinery- Air Emission Measurement System

Abu Dhabi

Refinery

40,000,000

FEED ITB

Union Chlorine - ICAD Chlorine Alkali Plant

Abu Dhabi

Chlor Alkali

70,000,000

Construction

VOPAK HORIZON - Fujairah Oil Terminal Expansion (Phase 7)

Fujairah

Gas Storage Tanks

200,000,000

Engineering & Procurement

1,300,000,000 165,000,000 80,000,000

FEED Construction Engineering & Procurement

FEED FEED

VTTI - Fujairah Terminal

Fujairah

Oil Storage Tanks

120,000,000

Construction

ZADCO - Umm Al Dalkh ESP Installation Package 2 (Phases 3, 4 and 5)

Abu Dhabi

Sub Sea Cable

650,000,000

Construction

ZADCO - Umm Al Dalkh Full Field Development (Overview)

Abu Dhabi

Oilfield Development

650,000,000

Construction

ZADCO - Upper Zakum Full Field Development 750 Project (Overview)

Abu Dhabi

Oilfield Development

15,600,000,000

Construction

ZADCO - Upper Zakum Full Field Development 750 Project - Surface Facilities - EPC 1

Abu Dhabi

Oilfield Development

1,300,000,000

Construction

ZADCO - Upper Zakum Full Field Development 750 Project - Surface Facilities - EPC 2

Abu Dhabi

Oil Production

4,200,000,000

Construction

ZADCO - Zirku 7th Crude Oil Storage Tanks

Abu Dhabi

Oil Storage Tanks

300,000,000

Construction

ZADCO - Zirku Facilities Capacity Enhancement

Abu Dhabi

Oilfield Development

400,000,000

EPC ITB

ZADCO- 750 West RegionCapacity Expansion & Sulphate Reduction Plant- EPC 3

Abu Dhabi

Oil & Gas Field

300,000,000

EPC ITB