Academic Portfolio / University of Edinburgh School of Architecture 2011-2015

Page 68

GC1 GC2 GC3 GC4 GC5 GC6 GC7 GC8 GC9 GC10 GC11

TE APPLICATIONS

YEAR / 2 SEMESTER / 2

/1

/2

1

2

3

primary/secondary structure

vapour barrier: wet/dry

hot/cold

4

5

7

8

6 9 external envelope

1 / DIAGRAMS / Diagrams exploring the build-up of the wall, highlighting structure, services and thermal impact.

2 / EXPLODED ELEMENT / Exploded wall to roof junction. The wall is cast in-situ concrete whereas the roof is pre-cast hollow-core concrete slabs supported by a steel truss, with a thin layer of in-situ concrete cast over the top to maintain visual continuity with the walls.

068 /

services

Double glased safety glass

1/

Window frame: powder coated aluminium

2/

Concrete false roof: self compacting, waterproof in-situ concrete/ Insulation

3/

Damp proof membrane on top of concrete roof

4/

180mm EPS thermal insulation inside cavity

5/

Cast in-situ self compacting pigmented concrete

6/

Lightweight metal frame, insulated

7/

Timber battens supporting insulation and plasterboard

8/

150mm hollow core slab

9/

Load bearing exterior wall: 300mm cast in-situ self compacting pigmented concrete

10 /

Steel truss (200 x 200mm upper chord / 200 x 150mm lower chord)

11 /

75mm thermal insulation

12 /

75mm insulation in area surrounding roof lights to negate cold-bridging

13 /

Damp proof membrane

14 /

10

12 13

14


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.