primary/secondary structure
vapour barrier: wet/dry
hot/cold
4
5
7
8
6 9 external envelope
1 / DIAGRAMS / Diagrams exploring the build-up of the wall, highlighting structure, services and thermal impact.
2 / EXPLODED ELEMENT / Exploded wall to roof junction. The wall is cast in-situ concrete whereas the roof is pre-cast hollow-core concrete slabs supported by a steel truss, with a thin layer of in-situ concrete cast over the top to maintain visual continuity with the walls.
068 /
services
Double glased safety glass
1/
Window frame: powder coated aluminium
2/
Concrete false roof: self compacting, waterproof in-situ concrete/ Insulation
3/
Damp proof membrane on top of concrete roof
4/
180mm EPS thermal insulation inside cavity
5/
Cast in-situ self compacting pigmented concrete
6/
Lightweight metal frame, insulated
7/
Timber battens supporting insulation and plasterboard
8/
150mm hollow core slab
9/
Load bearing exterior wall: 300mm cast in-situ self compacting pigmented concrete
10 /
Steel truss (200 x 200mm upper chord / 200 x 150mm lower chord)
11 /
75mm thermal insulation
12 /
75mm insulation in area surrounding roof lights to negate cold-bridging
13 /
Damp proof membrane
14 /
10
12 13
14