GC1 GC2 GC3 GC4 GC5 GC6 GC7 GC8 GC9 GC10 GC11
TE APPLICATIONS
YEAR / 2 SEMESTER / 2
/1
/2
/3
1 / SECTION A / Short section through ramp and main deck. Drawn at 1:100/A3
2 / ISOMETRIC / Exploded isometric diagram of the structure. (1) Balustrade, (2) Deck, (3) Secondary Beams, (4) Primary Beams, (5) Posts. (Credit: Bojana Papic)
3 / CONSTRUCTION DETAILS / Beam junction details. Hidden steel plate connection for the primary beams to the post (left), and a joist hanger with adjustable height strap for the primary to secondary beams (right). Drawn at 1:10/A3 (Credit: Lovisa Lidstrรถm)
065 /
1
2
3
4
5