Page 29

Stock Bikes - Bike Guru Bike Building The Bike Guru is responsible for creating a weekly list for the Bike Builders to follow. This list will encompass bikes to be built to fill the floor (from the floor plan) as well as customer bikes to be built (yellow cards in ‘bikes to be built’). Process: 1. Bike built using checklist on bike delivery envelope. Each point checked off from start to finish and test ridden 2. Price tag removed from the bike box – stamped and signed on the underside

Expectations: • New builders need to be checked off by the mechanic until they are 100% competent • Serial Number MUST be recorded for each bike • Owner’s manual placed in the bike delivery envelope and checked off start to finish, unless there is a rule for this bike to only receive a manual and not an envelope • Circle if the bike has a bike delivery envelope or just a standard manual

3. Price tag folded neatly where the red meets the white and fixed to the handlebars on the drive side 4. Find existing A5 bike tag or attach new one to the middle of the handlebars with 2 black zipties 5. Writing up a new A5 tag: • Rule: Consistency is number 1 • Brand, model, RRP, loyalty price (3% off RRP) • Place in plastic sleeve 6. Note all details in the bike build book 7. Displayed neatly on the floor 8. Charge a Bike Build out to yourself through R.E. via item # 131950 on the day the bike is built **Bike Builds will NOT be paid without following this full process**

99 bikes BRAND GUIDE

29

99 Bikes Brand Guide  

99 Bikes Brand Guide

99 Bikes Brand Guide  

99 Bikes Brand Guide

Advertisement