Page 125

Solutions

Detail 1: Front view of wall — wall assembly

Embedded threading Embedded for facadesthreading for facadesthreading Embedded for facades Concrete filling Concrete filling Concrete filling Easy slip coating on sides Easy slipslips coating (Casting off on sides (Casting slips off on sides Easy slip coating when disassembled) when disassembled) (Casting slips off when disassembled) Bolted connection Bolted connection Bolted connection Bolt covering Bolt covering Bolt covering Stirrup Stirrup Stirrup

103

How to design

Detail 2: Vertical view of wall — deck construction designed for disassembly. Concrete filling Concrete filling Easy slip coating Concrete filling on sides Easy slipslips coating (Casting off on sides (Casting slips off on sides Easy coating whenslip disassembled) when disassembled) (Casting slips off when disassembled) C - profile C - profile Slim line deck C - profile Slim line deck Fire proof material Slimproof line deck Fire material Fire proof material Embedded threading Embedded for facadesthreading for facadesthreading Embedded for facades

Detail 3: Horizontal view of wall elements designed for disassembly.

Friction locks Friction locks Friction locks Embedded threading Embedded for facadesthreading for facadesthreading Embedded Concrete filling for facades Concrete filling Easy slip coating on sides Easy slipslips coating Concrete filling (Casting off on sides (Casting slips off on sides Easy slip coating when disassembled) when disassembled) (Casting slips off when disassembled)

Profile for 3XN_GXN

Building A Circular Future  

This book presents findings, case studies, background and context for the project ’Building a Circular Future’, and consist of three main ch...

Building A Circular Future  

This book presents findings, case studies, background and context for the project ’Building a Circular Future’, and consist of three main ch...

Advertisement