Project Planning Final Report “AUTOMATIC  RAILWAY  LEVEL  CROSSING  CONTROL”

Submitted by: Khalifa Ali Mousa (Leader) Name 1: _______________________

ID 1:1021090052 _________

Sultan Majid Mohammed Name 2: _______________________

ID 2:1021090081 _________

Marwan Mohamed Name 3: _______________________

ID 3:1021090097 __________

Essa Mohammed Essa Name 4:_______________________

ID 4: 1021090066 _________

Supervisor: _____________________ Mr Mohsen Elostaz Section:

12 - 9 _____________________

Campus: ATHS-Dubai ________ 06/05/2012 Date: ___________

© Applied Technology High Schools, 2011


TABLE  OF  CONTENTS    

1. SUMMARY

3  

2. ACKNOWLEDGEMENT

4  

3. PROJECT OBJECTIVE

5  

4. PROJECT BACKGROUND

6  

5. PROJECT DESIGN APPROACH

7  

6. PROJECT PLAN & COST ESTIMATION

12  

7. PROTOTYPE PHOTOS AND ACHIEVEMENTS

16  

8. CONCLUSION

17  

9. REFERENCES

17  

   


2

   


1.  SUMMARY   This report provides an overview of the different planning phases and includes the activities conducted during each planning phase. The planning phases for my project titled “AUTOMATIC RAILWAY LEVEL CROSSING CONTROL” along with the outcomes of the different activities will provide a clear direction and guide in the assembly, execution and implementation of the project prototype in the second and third semesters. The main task of our project is to stop (cars, pedestrians, etc.) from crossing the railway while the train passing. We will use in our project many devices e.g. (PLC, alarm system, sensors, etc.). The train should stop automatically if the barriers fail to close without risking the train, cars or pedestrian.

   

 

3

   


2.  ACKNOWLEDGEMENT   We would like to take this opportunity to thank: 1- Our supervisor Mr. Mohsen Elostaz, for offering his assistance and guidance concerning writing report, design the project, build and test the prototype of our project. 2- Miss Marget, for her assistance and guidance in the library during our visit to the library.

   

 

4

   


3.  PROJECT  OBJECTIVE   •

The project is used for safety purposes to protect the (cars, pedestrian, trains, etc.) from accidents by controlling the flow of the cars or the pedestrian and by alerting them automatically.

To design and construct a railway level crossing system that can control barriers to warn and stop vehicles crossing railway tracks when a train is approaching.

Teamwork.

We will learn mechanical skills.

We will learn electrical skills.

We will know how to buy the parts.

Will take more experience about PLC and some electronics parts.

We will learn how to make good communications.

How to write a report by a professional way.

The train should stop automatically if the barriers fail to close without risking the train, cars or pedestrian.

                               

 

5

   


4.  PROJECT  BACKGROUND   We know from our observation in our real life, these systems use signal light, gate, sensors and control unit. The project is used mainly for safety, as we know the system will work automatically without any help or assistance from any human. We saw the real system it was very simple, but also useful. Without this system there will be many accidents and fatal disasters will happen everyday.

   

 

6

   


5.  PROJECT  DESIGN  APPROACH   The main function of the “AUTOMATIC RAILWAY LEVEL CROSSING CONTROL” project is to stop vehicles, pedestrians, etc. from crossing the railway while the train crossing. The project team should ask “How to operate the alarm system?” The project team will brain storm possible solutions such as using PLC The outcome result for “AUTOMATIC RAILWAY LEVEL CROSSING CONTROL” should have all the requirements and cover all the safety procedures and it should have a nice finishing the most important thing that the project has to work perfectly.

   

 

7

   


• the required parts:

Parts

Function

Alarm system PLC system Switches Display Screen Light signals Railway crossing barrier NXT

To send a sound file to alarm the people that the train is coming To operate all the moving parts To control the parts To show how far the train from the gates To show that when the people can pass the road To block the way before the train arrive or pass

To control the gate system

block diagram: 1-­‐  When  the  train  reach  to  the  first   point   • The  alarm  produce  sound   • Orange  signal  will  ac5vate   • The  screen  will  show  how  many  meters  le9   for  the  train  to  reach  

2-­‐  When  the  train  reach  to  the   second  point  

3-­‐  When  the  train  cross  over   • The  alarm  will  stop   • The  gate  will  open  and  the  emerfency  gate  will   close   • The  screen  will  change  the  distance  signal  

• The  gate  has  to  close  to  stop  the  cars  and   the  emergency  gate  will  open   • The  screen  will  change  the  distance  signal   • Another  alarm  will  start   • Flashing  red  signal    will  ac5vate     • the  Orange  signal  will  switch  off  

   

 

8

   


a layout sketch:

   

 

9

   


AutoCAD:

NXT program:

PLC program:

Red Signal Flasher Circuit

Sensor 1

Orange Signal

Buzzer

Sensor 2

   

 

10

   


Project Progress Report:

Requirements

In Progress

Completed

Review the design report steps

Review step1 (main tasks) for

“AUTOMATIC RAILWAY LEVEL CROSSING CONTROL” project.

List the main tasks for your project in the design report.

Understand step-2 (main parts) for “AUTOMATIC RAILWAY LEVEL CROSSING CONTROL” project.

List down the main parts for your project in the design report.

Understand step-3 (block diagram to represent action) for “AUTOMATIC RAILWAY LEVEL CROSSING CONTROL” project.

Draw the block diagram for your project

Understand the method of drawing sketches by referring to the “AUTOMATIC RAILWAY LEVEL CROSSING CONTROL” example. Sketch the layout for your project

Prepare test circuits for each sub task

and test their functionality using different methods and resources.

Choose an appropriate implementation method.

   

 

11

   


6.  PROJECT  PLAN  &  COST  ESTIMATION     •

The Work Breakdown Structure diagram for the project:

Drilling   Construc5ng  The   Railway  

Mechanecal  Work  

CuOng  

Control  Circuit   Building  The  Circuit   “AUTOMATIC  RAILWAY   LEVEL  CROSSING   CONTROL”    

Power  Circuit  

Wri5ng  The  Program  

Downloading  the   Programe    

Electrical  Work   Control  Circuit   Prototype  Tes5ng  

 Tes5ng   Power  Circuit   Devloping  The   Flowchart  

   

 

12

   


Codes, duration and materials required for each task:

Code

Task

Duration

Resources

M-1

Marking

1 week

Markers

M-2

Sawing

1 week

Hack saw blades

M-3

Drilling

1 week

Drilling bits

M-4

Cutting

1 week

N/A

M-5

Mechanical testing

1 week

N/A

E-1

Building

the

power 3 week

circuit E-2

Building

Switches, sensors and wires.

the

control 2 weeks

circuit

Basic stamp PLC, NXT, sensors, switches and relays

   

E-3

Writing the program

1 week

NXT and PLC.

E-4

Electrical testing

1 weeks

N/A

PT-1

Prototype testing

2 weeks

N/A

PT-2

Prototype Developing

2 weeks

N/A

RP

Reporting

2 weeks

N/A

Total

18 weeks

 

13

   


Quantity and specifications of materials required:

Sl

Material

Quantity

No

Specifications

Estimated

& Dimensions

(Dhs)

1

Buzzer

1

N/A

15

2

Sensors

2

Optical Sensor

Free

3

PLC

1

N/A

300

4

Insulation Tape

2

3

5

Transformer

1

6

Wire roll

10

According to the wires color 240 V Input 24 V Output Different colors

Free 10

(0.5 mm) by m 7

Lights

12

Green, orange

12

and red

   

8

The train

1

N/A

30

9

NXT Wires

8

1m

70

10

NXT

1

N/A

Free

11

Wooden Base

1

(1*1*0.25) m

200

12

Relays

5

24V Relay

Free

13

Power Supply

1

AC to 24V DC

Free

Total

30

640

 

14

   

cost


Gantt Chart:

   

 

15

   


7.  Prototype  Photos  and  Achievements   1. Scientific  Innovation  Fair  II  

2. Competition  at  ATHS  

                     

                    3. ESNC  2012  Exibition    

         

         

   

 

16

   


8.  CONCLUSION     We as a group conclude that this system is very important in the real life, because it manages the flow of the train, vehicles and pedestrians automatically, so all the movements will be faster and more organized, besides it will get safer, which is the most important point.

 

 

   

 

17

   


9.  REFERENCES   Internet websites 1. Video ((http://youtu.be/YuAdPgKGdE8)) www.youtube.com 2. ((http://en.wikipedia.org/wiki/Level_crossing)) A level crossing occurs where a railway line is intersected by a road or path on one level, without recourse to a bridge or tunnel. It is a type of at-grade intersection. The term also applies when a light rail line with separate right-ofway or reserved track crosses a road in the same fashion. Other names include railway crossing, railroad crossing, and road through railroad, train crossing or grade crossing.

Names of appropriate references that could be utilized: 1. What is a programmable logic controller (PLC)? It is basically a regular computer (pc) that’s been reduced to a micro-sized package. The reference is:

(Introduction to PLCs -Second Edition-) 2. Technological advances in recent years have resulted in the development of the programmable logic controlled (PLC) and a consequential revolution of control engineering. The reference is:

(PROGRAMMABLE LOGIC CONTROLLERS -Fifth Edition-).

   

 

18

   


© s.m.m


Graduating Project Final Report  

Graduating Project Final Report

Advertisement
Read more
Read more
Similar to
Popular now
Just for you