Section 3
Routine Maintenance
2-2 * Initial
Service Schedules
Section 3 2-2
Precautions for New Machine Usage ! CAUTION
If the machine is operated at full load, before its initial run-in procedure is complete it may cause scuffing and seizing which can adversely effect the life of the machine. 8-3-1-5
A new machine is only dispatched when it has completed all its inspection procedures, but operating it under severe conditions from new will affect its performance and shorten its service life.
1. Carry out the Daily inspection procedure 2. Always warm up the machine sufficiently 3. Hold the engine speed to 80% of the maximum 4. Check to see if the machine is running normally 5. Avoid running or swinging the machine rapidly 6. Avoid sudden shocks e.g. suddenly stopping the boom when lowering
7. Where applicable, grease the front pins daily 8.
At 50 hrs carry out servicing
9803/6400
Issue 2*