Splitting the Sisu engine/GTA1030 Preparing for disassembling 23. Cancel the front axle oscillation (all versions) by sliding a suitable chock in at each side of the front frame (1) (Fig. 9). 24. Chock the rear wheels. 25. Install (Fig. 11): - a fixed stand at the front of the gearbox, - a mobile stand at the back of the engine. 26. If necessary, split the cab from the front right- and left-hand supports. Gently lift it using two straps fitted to the lateral handles. Temporarily chock the cab by sliding a suitable chock under each of its supports.
1
1
MA-02-05132A
Disassembly
Fig. 9
27. Release the screws and nuts attaching the engine to the gearbox (Fig. 10). Mark: - screw length and position; - nut position. Dimensions of the screws and nuts (Fig. 10) Screw
Nuts
M16x60 M16x80 M16x110 M22x80 M22x160
M22x2,5
28. Split the assemblies with the help of an operator (Fig. 11). When disassembling, check that connections (hoses, pipes and harnesses) are all disconnected.
2B21.8
¤ H
Massey Ferguson 6400 - Issue 4.a