Page 75

ENGINE AND PTO IN - ENGINE

20.

21.

22.

23.

Connect the ground to engine from battery quick disconnect (18) and cab ground (19).

931001910

20

931001909

21

931001908

22

931001903

23

Connect the two starter connections (D) and (E).

Connect the two alternator connections (F) and (G).

Install upper radiator hose (20) to engine and tighten hose clamp.

84423866 25/07/2011

B.10.A / 35

Case sv250 skid steer loader service repair manual  
Case sv250 skid steer loader service repair manual  
Advertisement