Redmond Central Connector

Page 91

the desIgn Bus Shelter

Bus Shelter

Bus Shelter

Soft Trail Existing Rails Remain

Existing Rails Remain

12’ Paved Trail

12’ Paved Trail

12’ Paved Trail

Ties (Paving Banding)

Ties (Paving Banding)

NE 116th St.

NE 116th St.

NE 116th St.

Willows Roa

trail with railroad tracks Eastside alignment 12’ paved trail Westside soft trail Vegetation buffer

d

d

d

Willows Roa

Willows Roa

trail w/o railroad tracks Center alignment 12’ paved trail over existing rail bed

Ties (Paving Banding)

trail with railroad tracks Westside Alignment 12’ Paved Trail Vegetation buffer

* As future trail planning and deisgn takes place in the Sammamish Valley, Public Works should be engaged to coordinate the potential widening of Willows Road.

81


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.