Client: Bikram Yoga
Building: Loughton, Essex
Date: 2013
Sector: Leisure
SPECIALIST INTERIOR REFURBISHMENT CASE STUDY
SPECIALIST INTERIOR REFURBISHMENT AT BIKRAM YOGA STUDIO ABOUT THE PROJECT Quest Interiors were involved in the development of the first licenced Bikram Yoga studio in Essex. The client approached Quest to transform the existing space into a state of the art Yoga Room with a HVAC system specifically designed to meet the exacting demands of Bikram Yoga.
The flooring system used provides a highly effective anti-microbial solution which protects against bacteria including MRSA, E-coli and the development of dust mites. In addition, the highest quality surface finishes were used throughout to provide the most ambient facility with adaptable feature lighting systems throughout.
PROJECT CHALLENGES
London Studio Studio 2 109 Gloucester Road London SW7 4SS Telephone 020 3609 1312 Email info@questinteriors.com
Bikram Yoga requires studio temperatures of up to 40°C to be maintained with a humidity of 40%. Quest Interiors worked with the client to deliver an ambient new studio with an air conditioning system that continuously replenishes the air with over 1000 litres per second.
OUR SERVICES
The flooring needed to be resilient and slip resistant as well as being waterproof. Flotext Eco Carpet was used within this project to provide an acoustically sound, waterproof, durable flooring solution, ideal for the studio environment.
• Brief Development
3
• Environment & Sustainable Design
3
• General Arrangement Plans
3
• Design Development
3
• Budget Control
3
• Design & Build
3
• Specialist Refurbishment Works
3
• Specialist Interior Works
3
• Complete After Care (FM Small Works)
3
www.questinteriors.com