PACIFIC O CE A N
Ocean Beach
Outfall
4.2
4.2
4.1
at The (New) Gre
4.3
Highway
Ulloa St
4.1
V-30
ocean beach master plan | May 2012
4.2
Sand Ladder
Restored Dune Bike Lane
il Promenade / Coastal Tra
ay The (New) Great Highw
Figure V-21: Middle Reach | Key Move 4 Illustrative Plan The fourth key move of the master plan focuses on the restoration of the beach dunes.
Ocean Beach
4.3 Wawona St
(new) Sloat Boulevard
Insert: Dune Restoration Area, Detail Plan
il Existing Median Tra Lower Great Highway
Insert Scale
0
100 ft
200 ft