Looking Ahead to 2009-2010 Energy and Water Use Management Activities Next 12 months Activities
Measurement Expected Actual
Annual Savings Expected Actual
Cost
Jobs
Assigned to
Funding Source
Winter break setback.
Conservation TBD
TBD
TBD
N/E
N/E
Office of Energy Mgmt Salary
Dining Hall tray elimination.
Conservation TBD
TBD
TBD
N/E
N/E
Dining
Recommend energy and water best practices to the Standards Committee. Conservation TBD
TBD
TBD
N/E
N/E
Office of Energy Mgmt Salary
N/E
BM & O Utilities & Engineering Services
Evaluate other applications where rain or condensate water use would be appropriate. Conservation TBD
TBD
In June 2008, in the wake of an extreme multiyear drought, the decision was made to install a rainwater collection tank in Yarbrough Drive Thermal Plant. The water collected in this 1,000 gallon tank is used for cooling tower make-up. Cooling towers require huge amounts of water in order to do their job, much of which is lost into the atmosphere as condensate. Instead of purchasing additional potable water, rainwater is collected in this tank from the roof of the plant and then pumped back into the cooling towers. In the month since its installation, this system has collected and made up, and thus avoided the purchase of thousands of gallons of water.