25
Buildings in Alachua County Government In 2006 there were 48 Alachua County facilities (not counting leased space) totaling approximately 980,000 square feet. For that space, 19,257,309 kW-hours electricity was needed which was a 2.9% increase over 2004 consumption. The electricity was purchased at a total cost of $1.5 million.1
Energy Management research and development investigations: •
•
Use of green roof systems to lower the building temperature, requiring less energy to cool the building Installation of dual-flush toilets creating a 40% water saving each flush
Bringing the Global Perspective Home: Creating a case for high performance green buildings in Alachua County government. http://www.alachuacounty.us/assets/uploads/images/epd/documents/ECSC/GreenBldg_12-08-06.pdf
Energy Reduction Policy Update, June 2008
Total utility costs for this chart in all sectors is approximately $1.6 million. Water and energy efficiency upgrades at the County Jail are expected to result in considerable long term savings and conservation of natural resources.