Action of transfer-carriage
419
4
which should be so adjusted as barely to permit the passage of the thickest matrix. After the composition of the line is completed in
pending spring g
,
the assembling elevator G, as
FIG.
the elevator
is
raised as
shown
in Figure 12,
16.
shown
in Figure 13, so as
to present the line between the depending fingers of the transfer-carriage N, which then moves to the left to the position
shown by dotted
lines in
Figure
13, thereby bringing the line into the first elevator 0, which then descends, carrying the line of mat-
rices
downward, as shown
in Figure 14, to its