SEPTEMBER, 22ND | THURSDAY SLURRY PIPELINES ROOM D - MEZANNINE Session Chairman:
8:30/10:30
» Ricardo Nébias - Samarco » Lílian Lís Andrade Cantuário Costa - Vale Fertilizantes
8:30/9:00 IBP2074_11
MINING SLURRIES TRANSPORT SYSTEMS: KEY DESIGN AND COMMISSIONING FOR A SUCCESSFUL PROJECT Pablo Vásquez Salazar - JRI Ingeniería S.A.
9:00/9:30 IBP1480_11
DESIGNING AND TESTING THE WORLD‘S LARGEST SLURRY PIPELINE BALL VALVE AND ACTUATOR. FROM CONCEPTUAL DESIGN TO FACTORY ACCEPTANCE TESTING OF THE 750MM ASME CLASS 900 SLURRY BALL VALVE AND HYDRAULIC ACTUATOR FOR THE LOS BRONCES COPPER MINE IN CHILE. Malcolm Harrison - ValvTechnologies Inc; Francisco Aros - Anglo American Sur SA.
9:30/10:00 IBP1858_11
MINIMIZING THE CARBON FOOTPRINT OF CONSTRUCTION AND OPERATION OF SLURRY PIPELINES Nara Altmann, Ingrid Flores - Brass Chile S.A.; Carlos Camarada, Roy Betinol - Brass
10:00/10:30 IBP1743_11
START-UP OF THE SECOND SAMARCO IRON CONCENTRATE SLURRY PIPELINE Rafael Lima, Jay Chapman - Ausenco PSI; Tatiana Alves da Silva- Samarco Mineração; Alisson Vidal - AusencoPSI
10:30/11:00
Break
SLURRY PIPELINES ROOM D - MEZANNINE Session Chairman:
11:00/12:30
» Ricardo Nébias - Samarco » Lílian Lís Andrade Cantuário Costa - Vale Fertilizantes
11:00/11:30 IBP1313_11
SLURRY CARRYING PIPELINE INTEGRITY MANAGEMENT SUPPORTED BY THE SILVERPIPE SOFTWARE FROM DNV Jorgen Piene - DNV; Ricardo Bruno Nebias Andrade - Samarco Mineracao; Anders HvidstenDNV
11:30/12:00 IBP1732_11
COARSE IRON CONCENTRATE SLURRY TRANSPORT SYSTEM Alisson Vidal, Daniel Sá, Jay Chapman, Rafael Lima - AusencoPSI
12:00/12:30 IBP1555_11
AN APPROACH ON FUTURE REGULATORY ISSUES RELATED TO SLURRY PIPELINES Ricardo Bruno Nebias Andrade, Vinícius Fileto Mansur - Samarco Mineração
12:30/14:30
Lunch
14:30/16:30
PANEL: PIPELINES TECHNOLOGY TRENDS (please see the page 15/21)
16:30/17:30
AWARDS AND CLOSING CEREMONY (please see the page 15/21)
49