Hostos Community College Operational Plan – FY 2012‐2013

Optimize physical infrastructure to meet student needs (G5, I2) Administration and Finance Annual Results Anticipated 4. Work with CUNY in The Heights Director and BMCC faculty & staff to design and outfit their new space at the Verizon site (5030 Broadway)

Unit Name Key Activities Timeline Q1 Buildings & Grounds Meet with the Directors of the Continuing Education department to determine their space needs in the new rental site Meet with landlord's architect to develop construction documents that meet the needs of the Continuing Education department

Team Campus Planning; Executive Director of CUNY in the Heights; Project Architect; Contractor

Work with furniture vendor to develop furniture layout for the new rental space

5. Work with the VP for Student Development & Enrollment Management to create a new space for the Student Success Coaching Unit

Buildings & Grounds Develop construction documents for B&G inhouse staff to demolish existing walls and create a new space for the Coaching Unit

Q1

Campus Planning, Building & Grounds, Info. Technology, VP for SDEM, Furniture Vendor

Q1

Building & Grounds; Information Technology; VP for Institutional Advancement; Furniture Vendor

Work with furniture vendor to create a furniture layout that will meet the needs of the new unit and obtain the approval of the VP for SDEM

6. Expand the space currently occupied by Institutional Advancement in order to accommodate the new staff

Buildings & Grounds Identify space that can be used for expansion Meet with Division VP to discuss expansion plan and obtain approval Work with furniture vendor and Division VP to develop new furniture layouts and cost estimates

HCC Operational Plan FY 12‐13 ‐ G5, I2