© JAMES PEREZ/GP
image CONTROL ROOM OF LUZ SOLAR POWER PLANT, CALIFORNIA, USA.
appendix 7.1 employment by power station and calculation of local factors
table 7.4: south korea: factors for nuclear, coal, gas, oil and diesel, and hydro operations and maintenance
NO. OF EMPLOYEES
CAPACITY MW
LOCAL FACTORS JOBS/MW
Gori
KHNP
1,971a
3,137b
0.63
Yeonggwang
KHNP
1,308a
5,900b
0.22
Wolseong
KHNP
a
b
0.56
Uljin
KHNP
b
0.24
Nuclear
1,568
a
1,443
2,779 5,900
0.36
WEIGHTED FACTOR Coal
EWP
652c
4,000d
0.16
Hadong
KOSPO
e
f
0.23
703
3,000
0.19
WEIGHTED FACTOR Gas, oil, & diesel
Youngnam
KOSPO
165g
400h
0.41
Sinincheon
KOSPO
g
237
h
1,800
0.13
Busan
KOSPO
209g
1,800h
0.12
Ilsan
EWP
i
206
j
900
0.23
Ulsan
EWP
i
3,000j
0.17
514
0.17
FACTOR Hydro
All KHNP hydro
KHNP
331a
537b
0.62
sources a b c d e f g h i j
KOREA KOREA KOREA KOREA KOREA KOREA KOREA KOREA KOREA KOREA
HYDRO AND NUCLEAR POWER (KHNP) 2011 SUSTAINABILITY REPORT. P.13 - 14 ELECTRIC POWER COMPANY (KEPCO) 2011 ANNUAL REPORT. P.111 EAST-WEST POWER CO (EWP) 2010 SUSTAINABILITY REPORT. P.46 EAST-WEST POWER CO (EWP) 2010 SUSTAINABILITY REPORT. P.11 SOUTHERN POWER CO (KOSPO) 2008 SUSTAINABILITY REPORT. P.63 SOUTHERN POWER CO (KOSPO) 2008 SUSTAINABILITY REPORT. P.8 SOUTHERN POWER CO (KOSPO) 2008 SUSTAINABILITY REPORT. P.63 SOUTHERN POWER CO (KOSPO) 2008 SUSTAINABILITY REPORT. P.8 EAST-WEST POWER CO (EWP) 2010 SUSTAINABILITY REPORT. P.46 EAST-WEST POWER CO (EWP) 2010 SUSTAINABILITY REPORT. P.11
77
METHODOLOGY OVERVIEW
Dangjin
7 future employment |
COMPANY
TECHNOLOGY & POWER STATION