Greenfield Streetscape Enhancement

Page 19

ºº Parking lot offers little protection from the sun and contributes to urban heat island effect. ºº If the amount of parking stays the same, seventeen more trees are required to comply with town regulations. ºº Increasing shade could improve ecological health and enhance user comfort.

ºº Steep slopes in the northern half of the lot present a challenge to accessibility and a potential hazard in winter. ºº Polluted runoff may affect water quality in the river. ºº The high retaining wall could constrain potential grading changes and infiltration.

IMPLICATIONS ºº Cars cutting through lot at speed potentially dangerous to pedestrians.

The Vine The Vine

To Maple Brook

Wilson’s Employee Parking

Chapman Street

Retaining Wall

Retaining Wall

Retaining Wall

Retaining Wall Retaining Wall

Chapman Street

Chapman Street Salvation Army

The Vine

The Vine

Chapman Street Retaining Wall

Salvation Army

Davis Street

Wilson’s Employee Parking

Salvation Army

Salvation Army

Wilson’s Employee Parking

Wilson’s Employee Parking

Davis Street

Davis Street

Davis Street

N

Percent Slope 5-8% 3-5% 2-3% 0-2%

Underground To Main Culvert

Street

To Main 0’ Street

N

N

Wilson’s

Direction Wilson’s Existing Customer Parking of Surface Customer Storm Flow Parking Drain 50’

N

Struggling Trees

100’ 0’

50’

100’

Shade at Spring and Fall Equinox

Wilson’s Customer Parking

N

Wilson’s Customer Parking

To Main Street 0’

50’

332 S Deerfield Road | PO Box 179 | Conway, MA 01341 413-369-4044, www.csld.edu Spring 2012

Landscape Planning & Design

114 Main Street, Greenfield, MA 01301

IMPLICATIONS

IMPLICATIONS

• Two entrances off Chapman and Davis Streets. • Parking lot is used as a cut-through between the two streets. • No clear pedestrian path within parking lot.

Chapman lot Analysis

Not for construction. This drawing is part of a student project and is not based on a legal survey.

ACCESS & CIRCULATION

• Two trees at the northern end cast no shade on the property. • Two street trees cast a small amount of shade on the lot but are in poor health. • The lot does not meet current town requirements of one tree per ten parking spaces.

• Slopes range from 2% to 7%. • All stormwater drains to the buried Maple Brook and then the Green River with no filtration. • A retaining wall marks the northern border of the property.

N

Town Of Greenfield

VEGETATION & SHADE

DRAINAGE & SLOPES

Key Plan N.T.S.

Water sheets down the sloped asphalt during a light rain.

Department of Planning & Development

Located one block north of Main Street, this sloping, two-acre expanse of exposed asphalt is slated for upcoming renovation. Rarely more then half-full, a re-design has the potential to greatly improve the lot’s attractiveness, usability, and contributions to environmental health.

Rachel Jackson & Christina Puerto STREETSCAPE ENHANCEMENT & Conway School ECOLOGICAL PARKING LOT DESIGN The Graduate Program in Sustainable

CHAPMAN STREET PARKING LOT

Chapman Lot

Vehicular Traffic 100’

19/26


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.