Abstract

Page 5

8 de Març & Isidre Nonell squares

osal. The first system is the Historic Path e are the recuperated medieval uses, respectively. ith a playground and small Façade Activity ntres there are two sojourn Esponge e Activity ns produced by façade There are two overall horizontal systems Circulation in the proposal. The first system is the nge Espoto the façade activity. ed the divided by usage strips. The second one are the recuperated medieval surfaceInitself, wPlayg equipment theplot other, paths.In The and the square shelter three and two uses, respectively. round entrance. Façade Activity In the south of the plot is placed the activity fringe with a playground and small Circulation Esponge terrace that today belongs to a small cafe. In both centres there are two sojourn Playground areas that work as a sponge which absorb the tensions produced by façade plains’ distortion. In the north, the strips are connected to the façade activity. In the Circulation There are two overall systems in to thethe proposal. Theand firstthe system is the plot,horizontal it totally surrenders aqueduct new equipment entrance. In the other, surface itself, divided usagetostrips. second one are the recuperated medieval it is by related a ThaiThe restaurant. paths. The plot and the square shelter three and two uses, respectively. n the south of the plot is placed the activity fringe with a playground and small errace that today belongs to a small cafe. In both centres there are two sojourn areas that work as a sponge which absorb the tensions produced by façade plains’ distortion. In the north, the strips are connected to the façade activity.His Intor the ic Path plot, it totally surrenders to the aqueduct and the new equipment entrance. In the other, t is related to a Thai restaurant.

at Projetcs and Works Dep. (Barcelona City Council) Team: Mariona Nubials / Carles Tuca / Eduard Valencoso Location: Barcelona (Central Old town), Barcelona, Spain Esponge h Historic Pateur Butget: ± 270 000

Historic Path

Façade Activity

Circulation

(2010 - 2011) 41 23 07 N / 02 10 28 E

Façade Activity

e ong one are the recuperated medieval They Façade Activity were interested in EspCirculat the ion Esponge paths. In the south of the plot is placed archaeological buried remains of the dPath roun Playg ic tor His ation and the rehabilitation the activity fringe with a playground building Circul site de Activity and small terrace that today belongs of aqueduct. The Faça challenge of the e ong Esp Façade Activity ion Esponge project was to give the Circulat public space to a small cafe. In both centres there Façade Activity Esponge Playground Façade Activity back to citizens, increase the number are two sojourn areas that work as Circulation Esponge Circulation d of playgrounds in the city centre a sponge which absorb the tensions Playgroun Circulation Historic Path and emphasize the presence of the produced by façade plains’ distortion. aqueduct while replacing the bikers’ In the north, the strips are connected vity de Acti in the proposal. The first system is the ontal systems in the proposal. TheThere first system the horizontal Faça are twoisoverall systems e Espong age strips. The second recuperated medieval Façadeone Activityare thesurface itself, divided by usage strips. The second one are the recuperated medieval parking lot. There are two overall to the façade activity. In the plot, it Circulation are shelter three and Espo twonge uses, respectively. paths. The plot and the square shelter three and two uses, respectively. laced the activity fringe with a playground and small totally surrenders to the aqueduct and horizontal systems in theHistorproposal. In the south of the plot is placed the activity fringe with a playground and small d Pat Playgrounthere are two sojourn ic Path Historic h toEvery a small cafe.and In both that today belongs to a small cafe. In both centres there are two sojourn system everycentres strip haveterrace pavement. The medieval ationtheir own Circul e which the tensions produced by façade The first system is the surface itself, the new equipment entrance. In the areas that work as a sponge which absorb the tensions produced by façade path isabsorb reproduced by a yellow sandy stone. Red asphalt is extended There are two overall horizontal systems in the proposal. The first system is the rth, are connected the façade activity.such In allthe overstrips the most static areas,to while soft pavements as rubber plains’ distortion. In the the north,gravel the strips are connected to the façade activity. In the Activity vity surface itself, divided by usage strips. The second one are the recuperated medieval the andsystem theused new equipment Inthe thesquare other, andaqueduct granitic sand are the plot, playground andsurrenders on centre. system and every strip have their own pavement. The medieval it is related to a Thai restaurant. dividedFaçadeby usage strips. The secondFaçade Actiother, it entrance. totally to the aqueduct and the new equipment entrance. InEvery the other, e proposal. The first ison the Espong Esponge paths. The plot and the square shelter three and two uses, respectively. Façade Activity Façade Activity

The ramp in front of the aqueductitisiscovered wiped out stone called rant. path is reproduced by a yellow sandy stone. Red asphalt is extended Circulation to aaThai restaurant. Circulation d one are the recuperated medieval relatedwith nge soft pavements such as rubber gravel In the south of the plot is placed the activity fringe all with a playground and small Espowhile Esponge “Montjuic”, very common in historical buildings of the city. over the most static areas, Historic Path two uses, respectively. terrace that today belongs to a small cafe. In both centres theresand are are twoused sojourn and granitic on theroun playground and on the square centre. d proposal. The first system is the Playg Playground ge with a playground and small h areas that work as a sponge which absorb the tensions produced byoffaçade Pat h ic The ramp in front the aqueduct is covered with a wiped out stone called Pat tor ic His tor His Circulation d one are the recuperated medieval th centres there are two sojourn Circulation plains’ distortion. In the north, the strips are connected to the very façade activity. In the buildings of the city. “Montjuic”, common in historical two uses, respectively. Every system and every strip have their own pavement. The medieval ensions produced by façade plot, it totally to the There are two overall horizontal systems in the surrenders proposal. The firstaqueduct system is and the the new equipment entrance. In the other, ge withto a playground and small path is reproduced by a yellow sandy stone. asphalt is extended FaçadeRed Activity h nected the façade activity. In the torbyic Pat it is related to a Thai restaurant. ic Path HisAccessibility de Activity Plural Projection Activity tor Faça surface itself, divided usage strips. The second one are the recuperated medieval de His Faça all over the most static areas, while soft pavements th new centres there areentrance. two sojourn Esponge such as rubber gravel he equipment In the other, Esponge the square Activity shelter three and two uses, respectively. Esponge Façade Activity and granitic sand are used on the playground and on the square centre. ensions produced by façadepaths. The plot andFaçade Circulation ion Circulat d out stone called Playgaroun nge the activity fringe In the south of the plotEspo is placed with a playground and small The ramp in front of the aqueduct is covered wiped Esponge nected to the façade activity. In the Path with Activity Historic Plural Projection Historicbuildings FaçadePlayground Press & Publications Accessibility Project to Hot_spots Façade Activity terrace todayConstruction belongs a small centres there are two sojourn “Montjuic”, very common in historical ofCircul the ation city. he new equipment entrance. In thethat other, d cafe. In both roun d Esponge produced by façade Playgwhich Façade Activity Esponge Façade Playg Activityroun areas that work as a sponge absorb the tensions Circulation ion Circulat ation Circulthe strips are connected to the façade activity. In the Esponge Esponge Circulation plains’ distortion. In the north, Every system and every strip have their own pavement. The medieval Motorbike Parking Leisure Activity Public Events Press & Publications Façade Activity Tourist Project Hot_spots plot, it totally surrenders to Spot the aqueduct and the new equipment entrance. In the other,

al

Project Main Plan _1 | 400

Façade Activity

Esponge

Circulation

Historic Path

e other, N

N

Playground it is related ation to a Thai restaurant. Circul Floor Plan 1/200

Playground

Circulation Historic Construction Every system and every strip have their own pavement. The medieval Public Events Sojourn & Panoramic Electric Motorbike Parking path is reproduced by a yellow sandy stone. Red asphalt is extended all over the most static areas, while soft pavements such as rubber gravel and granitic sand are used on the playground and on theLeisure square Activity centre. The ramp in front of the aqueduct is covered with a wiped out stone called “Montjuic”, very common in historical buildings of the city.

Sojourn & Panoramic Historic Construction Playground

Floor Plan 1/200 Every system and every strip have their own pavement. The medieval

path is reproduced by a yellow sandy stone. Red asphalt is extended Playground Plural Projection

on

Accessibility Leisure Activity

all over the most static areas, while soft pavements such as rubber gravel and granitic sand are used on the playground and on the square centre. ramp in front of the aqueduct is covered with a wiped out stone called MotorbikeThe Parking Press & Publications Project Hot_spots Sojourn & Panoramic “Montjuic”, very common in historical buildings of the city.

mic

Electric Motorbike Parking

Public Events

Tourist Spot

Playground

path is reproduced by a yellow sandy stone. Red asphalt is extended Esponge Façade Activity all over the most static areas, while soft pavements such as rubber gravel Circulation ngeProjection and on the square centre. Espo Plural and granitic sand are used on the playground Accessibility The ramp in front of the aqueduct is covered with a wiped out stone called d Playgroun “Montjuic”, very common in historical buildings of the city.

Tourist Spot

Motorbike Parking

ation

PressCircul & Publications

Façade Activity

Electric Motorbike Parking

Esponge Playground Circulation Public Events

Project Hot_spots

Façade Activity

Esponge

Circulation

Tourist Spot

Plural Projection Accessibility There are two overall horizontal systems in the proposal. The first system is the surface itself, divided by usage strips. The second one are the recuperated medieval paths. The plot and the square shelter three and two uses, respectively. Motorbike Parking Press & Publications Project Hot_spots In the south of the plot is placed the activity fringe with a playground and small terrace that today belongs to a small cafe. In both centres there are two sojourn sponge which absorb the tensions produced by façade Events Electric Motorbike Parking areas that work as aPublic Tourist Spot plains’ distortion. In the north, the strips are connected to the façade activity. In the plot, it totally surrenders to the aqueduct and the new equipment entrance. In the other, Every system and every strip have their own pavement. The medieval Every system and every strip have their own pavement. The medieval it is related to asandy Thai restaurant. path is reproduced by a yellow stone. Red asphalt is extended

Façade Activity

path is reproduced by a yellow sandy stone. Red asphalt is extended all over the most static areas, while soft pavements such as rubberallgravel over the most static areas, while soft pavements such as rubber gravel and granitic sand are used on the playground and on the square centre. and granitic sand are used on the playground and on the square centre. The ramp in front of the aqueduct is covered with a wiped out stone Thecalled ramp in front of the aqueduct is covered with a wiped out stone called “Montjuic”, very common in historical buildings of the city. “Montjuic”, very common in historical buildings of the city. Every system and every strip have their own pavement. The medieval Press & Publications Project Hot_spots path is reproduced by a yellow sandy stone. Red asphalt is extended Every system and every strip have their own pavement. The medieval Every system and every strip have their own pavement. The medieval all over the most static areas, while soft pavements such as rubber gravel path is reproduced by a yellow sandy stone. Red asphalt is extended path is reproduced by a yellow sandy stone. Red asphalt is extended and granitic sand are used on the playground and on the square centre. Public Events Tourist Spot all over the most static areas, while soft pavements such as rubber gravel all overHistoric the mostConstruction static areas, while pavements such as rubber gravelAccessibility The ramp in front of the aqueduct is covered with a wiped out stone called Historic Construction Playground Pluralsoft Projection Floor Plan 1/200 Playground Plural Projection Accessibility Every system and every strip have their own pavement. medieval and granitic sand are usedThe on the playground and on the square centre. and granitic used onhave the playground and on the square centre. Every systemsand and are every strip their own pavement. The medieval “Montjuic”, very common in historical buildings of the city. path is reproduced by a yellow sandy Redofasphalt is extended The rampstone. in front the aqueduct is covered with a wiped out stone called The in front ofby the aqueduct is covered withasphalt a wiped stone called pathramp is reproduced a yellow sandy stone. Red is out extended all over the most static areas, “Montjuic”, while soft pavements suchinashistorical rubber gravel very common buildings of the city. “Montjuic”, very common in historical buildings of the city. all over the most static areas, while soft pavements such as rubber gravel Motorbike Parking Leisure Activity Press & Publications Project Hot_spots Motorbike Parking Leisure Activity Press & Publications Hot_spots and granitic sand are used on the playground and on the square centre. Every system and every strip have their own pavement.Project The medieval and granitic sand are used on the playground and on the square centre. The ramp in front of the aqueduct is covered with a wiped out stone called path is reproduced by a yellow sandy stone. Red asphalt is extended The ramp in front of the aqueduct is covered with a wiped out stone called “Montjuic”, very common in historical buildings of the city. all over the most static areas, while soft pavements such as rubber gravel “Montjuic”, very common in historical buildings of the city. Historic Construction Plan 1/200 Playground Public Events SojournFloor & Panoramic Electric Motorbike Parking Plural Projection Accessibility Public Events Sojourn & Panoramic Electric Motorbike ParkingTourist Spot Tourist and granitic sand are used on the playground and on the squareSpot centre. The ramp in front of the aqueduct is covered with a wiped out stone called Plural ProjectionPlayground Historic Construction Accessibility ElectricAccessibility SojournPlural & Projection Historic “Montjuic”, very common in historical buildings of the city.

Plural Projection

Accessibility

Esponge Playground Circulatio

Proposal’s concept

g

e Parking

N

N

Playground

Motorbike Parking

Motorbikes

Plural Projection Accessibility HistoricActivity Construction PlaygroundParking Press & Publications Motorbike Leisure

N

ng

Plan 1/200 Public Events Press Floor & Publications Electric Motorbike Parking Project Hot_spots Motorbike Parking Parking Tourist Spot Leisure Activity Sojourn & Panoramic Electric Motorbike

ke Parking

Leisure Activity

Project Hotspot

Public Events Sojourn & Panoramic

Touristic Spot

Tourist Spot Motorbike Parking Electric

Leisure Activity

Motorbike Parking

Press & Publications

Project Hot_spots

Plural&Projection Press Publications

Accessibility Project Hot_spots Sojourn & Panoramic

Electric Motorbike Parking

Public Events

Tourist Spot

HistoricPublic Construction Press &Events Publications

PlaygroundProject Tourist Hot_spots Spot

Panoramic

Project Hot_spots

Public Events

LeisurePublic Activity Events Sojourn & Panoramic

Construction

Plural Projection

Accessibility

Motorbike Parking Tourist Spot

Press & Publications

Project Hot_spots

Electric Motorbike Parking

Public Events

Tourist Spot

Playground

Every syste path is rep all over the and graniti The ramp i “Montjuic”,

N

Previous state

Historic Construction

Floor Plan 1/200

Playground Motorbike replacement

Plu

Leisure Activity

Motorbike Parking

Pre

Sojourn & Panoramic

Electric Motorbike Parking

Pub

Every system and every strip have their own pavement. The medieval path is reproduced by a yellow sandy stone. Red asphalt is extended all over the most static areas, while soft pavements such as rubber gra and granitic sand are used on the playground and on the square centr The ramp in front of the aqueduct is covered with a wiped out stone c “Montjuic”, very common in historical buildings of the city.

Historic Construction

Playground

Leisure Activity

Motorbike Parking

AB stract | by Carles Tuca Vancells | Pubic Space | 2/10

Plural Projection Isidre Nonell square

Press & Publications

Accessibility Isidre Nonell square

Project Hot_spots 05


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.